Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
• <br />• <br />• <br />I <br />MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, July 23, 2007 <br />7:00 o'clock p.m. <br />( #05 -3143 Dan Hessburg, Continued) <br />Gaffron stated Staff does analyze every plan thou <br />basement is below grade to constitute a basement <br />number of plans where houses are artificially put <br />White inquired whether the stairway and landings <br />regulations. <br />Curtis stated the City would have required that the <br />ly to ensure that a sufficient amount of the <br />er than a story. Gaffron stated the City has seen a <br />the ground in order to achieve another story. <br />built would be in compliance with today's <br />not exceed four by four. <br />White stated in his opinion this application should go back to the Planning Commission for their <br />recommendation since it has been changed from what was approved. <br />Murphy concurred that this application should go <br />the minutes reflect a discussion regarding impery <br />have been aware of that issue. <br />Hessburg stated the house has been on the market <br />is interested in purchasing the property and wants <br />inquired whether he could obtain an occupancy pc <br />City Attorney Mattick stated the issue here relates t <br />held up issuing a certificate of occupancy because c <br />should be apprised of the situation. <br />Hessburg stated the interested buyer is an attorney <br />he is unsure what should be done with the boulder <br />required, it would require the removal of those eve <br />Mattick stated it is his understanding there are <br />the boulder wall remains. <br />Hessburg stated he is unsure whether the City <br />Hessburg indicated he is willing to install add <br />Kellogg stated the drainage that was proposed <br />lakeward of the home. <br />k to the Planning Commission. Murphy noted that <br />pavers and hardcover and that the applicant should <br />ice November and that he does have somebody who <br />close on the property on August 15`l. Hessburg <br />dt for the new owner to move in. <br />drainage and that he does not believe the City has <br />drainage issues. Mattick stated the new owner <br />that he is aware of the situation. Hessburg stated <br />and that if the wall is removed and regarding is <br />-n trees on the neighbor's property. <br />additional swales that need to be completed even if <br />-er was aware of the turn- around and the drain tile. <br />drain tile if necessary. <br />the north lot line still needs to be constructed <br />Rahn inquired whether the City Engineer relies on a gutter system as the primary means of handling <br />runoff or whether they like to see the runoff handled in a different manner. <br />Kellogg stated they need the swales in the event of <br />opportunity to inspect the drain file system at the tii <br />is whether the work can be completed this fall. <br />Murphy stated Exhibit F in the Staff memo shows <br />with the applicant and that he did not hear back fr, <br />emergency and that they did not have the <br />it was being installed. Kellogg stated another issue <br />I the building inspector attempted to get in contact <br />him. Murphy questioned why the City should be <br />PAGE 5 of 17 <br />