My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic Compliance Inspection
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
710 Big Island - PID: 22-117-23-24-0009
>
Septic
>
Septic Compliance Inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:11:35 PM
Creation date
8/2/2016 10:00:29 AM
Metadata
Fields
Template:
x Address Old
House Number
710
Street Name
Big Island
Address
710 Big Island
Document Type
Septic
PIN
2211723240009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> A <br /> " � SeptlC T��'1 <br /> (� �s Septic tank sized per code or certification criteria? <br /> 1� �s Is septic tank installed per manufacturer's requirements? <br /> �j �s Does septic tank, riser(s) and access cover(s) meet applicable <br /> � �s 1/32"commercial efFluent filter/screen installed on outlet <br /> �s Is efFluent filter/screen able to be removed for cleaning? <br /> � �s Is septic tank accessible? <br /> �; � '' �s Are septic tank, risers and access covers watertight? <br /> � <br /> ���� ���� <br /> � <br /> ��` �s Pump tank sized per code or certification criteria? <br /> � <br /> � �s Is pump tank installed per manufacturer's requirements? <br /> �� � �� �s Does pump tank, riser(s) and access cover(s) meet applicable structural standards? <br /> : � <br /> ���� ��� �s Is pump tank accessible? <br /> % �� <br /> � � �s Are pump tank, risers and access covers watertight? <br /> �`�� �s All piping from septic tank to pump tank installed per code? <br /> �� <br /> �r design: Is pump sized correctly to deliver 5 to 15 gallons per module per dose? <br /> � �s Is pump installed per manufacturer's requirements and code? <br /> �s Is pump accessible and removable? <br /> � �Is check valve (if required), union and ball valve installed? <br /> � �Is anti-siphon mechanism installed, if applicable? <br /> � f�s Is drain-back hole been installed to prevent freezing of piping, if applicable? <br /> O. �s Is pump installed, connected and tested? <br /> � (type, gauge and length of wire, connected using water-proof connectors and the conduit sealed-of� <br /> ��'C� 1 <br /> � u Yes Is force main been installed with pressure rated fittings/pipe and per code? <br /> H � Yes Are fittings and pipe "cleaned", "primed" and "glued" properly? <br /> � ❑ Yes Is the force main sized according to manufacturer's recommendations? <br /> � (2"force main for 1 to 5 modules or 4"force main for 6 to 10 modules) <br /> n � Yes Is force main watertight? <br /> '1 ❑ Yes Is the force main installed to allow for drain-back to prevent freezing of piping, if applicable? <br /> 3 �111��?I� <br /> n <br /> � U ? Is flex pipe installed between force main and module? <br /> A � Yes Manifold installed per manufacturer's recommendations to allow for equal distribution and flow <br /> � splitting? (going past the last module a minimum of 6"and capped or clean-out at finished grade) <br /> �` Yes Is uniform distribution to each each module verified? <br /> � ❑ <br /> Call: 336-547-9338 or visit: anuainternational.com i <br />
The URL can be used to link to this page
Your browser does not support the video tag.