My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-2008 Council Minutes
Orono
>
City Council
>
2008
>
09-08-2008 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 2:17:45 PM
Creation date
7/23/2012 1:21:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />• <br />ORONO CITY 1 <br />Monday, S, <br />7:00 c <br />(4. #08 -3370 BARB AND KEVINDULIN <br />LLC,1785 CONCORDL4 STREET, Continued <br />Dulin stated they are relocating the residence fi <br />what would be a reconstructed buildable area. <br />foot zone and under on the structural coverage. <br />OF THE <br />INCIL MEETING <br />mber 8, 2008 <br />ck p.m. <br />J. SVEN GUSTAFSON OF STONEWOOD, <br />back and are attempting to fit the structure inside <br />are 4.5 percent over on the hardcover in the 75 -250 <br />Gustafson noted there is a city fire lane located on the property and that they have spoken with the City <br />about whether they would be able to use that land to help create a swale and correct the drainage on the <br />property. Gustafson commented it was his impression that the Planning Commission was in favor of <br />allowing the use of the fire lane to correct the drainage. <br />White noted the applicant should have been able <br />Dulin stated he would like to do that at the same <br />require heavy equipment. <br />McMillan asked whether rip -rap would be place <br />Dulin stated it would be. <br />remove the ice ridge a while ago. <br />as the floodplain work since both projects would <br />along the shoreline. <br />McMillan recommended the applicants give some' consideration to plantings to help with erosion. <br />• Dulin stated they would need to tear up the shoreline to remove the ice ridge and that they would look <br />into different options for that area. <br />.. j <br />McMillan asked whether the Minnehaha Creek Watershed District would need to approve this plan. <br />Dulin stated he has not submitted his plan to the MCWD at the present time. <br />McMillan stated in her view the floodplain worklis the most important and that perhaps approval from <br />the MCWD should have been obtained first. <br />I <br />Turner pointed out that typically the MCWD <br />Rahn asked what portion of the pool would be <br />Turner stated the entire pool would be <br />Rahn asked whether the house would be <br />Dulin stated it would be approximately five to <br />city approval prior to granting its approval. <br />hardcover. <br />hardcover. <br />right up to the sewer easement. <br />feet away from the sewer easement. <br />Rahn suggested the house be located closer to the sewer easement to help decrease the hardcover. <br />Turner stated the driveway apron and the approai <br />be shifted eight or ten feet, they would lose apprc <br />• Dulin stated they will locate it as far back as pos,! <br />would be shifted backwards as well, and if it could <br />mately 80 square feet of hardcover. <br />PAGE 5 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.