My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-2016 Council Minutes
Orono
>
City Council
>
2016
>
07-11-2016 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 12:13:33 PM
Creation date
8/1/2016 12:12:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, July 11, 2016 <br />7:00 o'clock p.m. <br />PUBLIC SAFETY REPORT <br />*10. DISPOSAL OF FORFEITED VEHICLES <br />Levang moved, Printup seconded, to authorize the disposal of the following vehicles: 2000 <br />Oldsmobile Bravada, VIN#1GHDT13WOY2213443; a 1999 Honda CRV, <br />VIN#HLRD1860XC018973; a 1998 Toyota Rav4, VIN#JT3GP10V8W7028483; a 2001 MZ <br />Motorcycle (Scooter), VIN#RFTJP50AX1L000026, through the Auto Auction. VOTE: Ayes 5, <br />Nays 0. <br />PUBLIC WORKS/CITY ENGINEER REPORT, CONTINUED: <br />Edwards reported on the following work performed by the Public Works Department: <br />• Pothole filling has been completed on Northern Avenue, Fox Street, and Dickenson Street <br />• Right -of -Way mowing has been completed <br />Culverts have been replaced on Leaf Street and Ferndale <br />• Culvert and shoulder repairs have been done on Spring Hill <br />Sewer repair was completed on Willow Drive South <br />• Water stub break repairs have been completed <br />• Aquatic weed removal has been initiated at three of the City's beaches <br />The Lurton parking lot expansion completed <br />• School traffic study has been completed for Old Crystal Bay Road <br />Recommended turn lane to northern high school entrance. The estimate to construct the turn lane <br />is approximately $68,000, with the City contributing $25,000 and the school managing the project <br />in conjunction with other internal improvements <br />McMillan asked how the Pavement Management Fund is. <br />Edwards displayed a breakdown of the pavement fund. Edwards noted the fund had a beginning balance <br />of $683,000 and that the approved work will bring that balance down to $332,896. <br />Walsh asked if the MSA fiend is lumped in there as well. <br />Edwards indicated it is not and that he can provide that update later. <br />McMillan asked if he is anticipating any seal coating this year. <br />Edwards stated it was his understanding the City Council did not want to move forward with that for this <br />year. 2016 deferred item include a mill and overlay on Casco Circle, seal coating, and reconstruction of <br />West Lafayette. <br />Page 12 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.