Laserfiche WebLink
• <br />• <br />U <br />MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, June 9, 2008 <br />7.00 'clock p.m. <br />(6. #08 -3360 BOB RITTER WITH BERKSHIRE PARTNERS, LLP, 2745 KELLEY <br />PARKWAY, Continued) <br />4. The landscape plan being revised to add planting materials north of the building and <br />boulevard trees along Kelley Parkway as well as to respond to the landscape architect's <br />review. !I <br />After further evaluation, the applicant's architect has determined the east parking aisle could not be <br />shifted west two feet as this would make the islands that define the center parking area too narrow to <br />support trees. The doors are not visible from Kelley Parkway. The Commission had found the original <br />location acceptable. <br />In addition to the items noted in the City Engineer's and the Landscape Architect's reviews, Staff <br />recommends the following items also be revised: <br />1. Landscape plan. The landscape plan does not include screening for the parking areas <br />adjacent to roads or boulevard trees along Kelley Parkway to continue the pattern set in the <br />Stonebay development. t <br />i <br />2. Lighting Plan: The lighting plan is not complete. Fixture designs were not provided and <br />the architect indicates the light levelsi adjacent to the building need to be increased. <br />Rahn asked if the building height to the top of the roof deck is 29.1 feet. <br />Turner stated to the top of the actual roof deck is 29.1 feet and the parapet is 31'/1 ". <br />Rahn asked whether that exceeds the height of the bank building. <br />Turner indicated the atrium is exempt and that the bank building is similar in height at 31 feet. The <br />proposed building would be constructed at existing grade. <br />Rahn noted the parapet wall would extend more than three feet above the height of the building and <br />asked whether that is allowed by code. <br />Turner stated her understanding of the code is that with a conditional use permit, you are allowed to add <br />three feet of parapet to the height of the building io go over the 30 feet. The parapet wall would qualify <br />for the conditional use permit but that the decorative feature would not. The top of the arch is <br />approximately 40 feet. <br />Rahn asked if the majority of the building is 31.1 <br />Turner stated the majority of the building is 31.1 <br />i <br />Rahn stated his main issue is the 18 foot parking <br />longer. -Rahn questioned whether the building shy <br />appropriate size parking stalls. <br />Turner stated the shorter parking stalls were allov <br />is proposing the shorter stalls for this site. If two <br />tall. <br />tall. <br />c and that in his view the parking stalls should be <br />be made smaller in an effort to allow for the <br />on the site for the bank and that the same architect <br />.itional feet were required to be added to those <br />PAGE 5 of 10 <br />