My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
10-15-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 2:13:35 PM
Creation date
7/16/2012 1:56:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, . ' . <br /> REQUIRED SUBMITTALS: �� <br /> All of the following information must be submitted by the application deadline date in order for your �' <br /> ��a lication to be processed. <br /> Pre-Application Meeting Form, completed by a City Planner. <br /> � Completed Application Form , <br /> ���� Completed Hardship Documentation Form <br /> Certified Property Owners List— owners within 150' of the subject property, labels and plat map. <br /> -List, � labels and map may be obtained. from Hennepin County Department of Finance, <br /> Government Center, A-603 300 South 6th Street, Minneapolis, telephone 612-348-5910 <br /> �'` Original Certificate of �Survey (signed by a licensed surveyor), ineeting all�the requirements <br /> listed within this packet, including liardcover calculations. Two original (scaled) versions and <br /> � provide one copy 8.5" x 11° or 11" x 17" for reproduction. <br /> N n � . Completed hardcover calculation worksheets (as provided within the variance packet). <br /> N o Topographic survey — including existing and proposed elevations, and proposed grading and <br /> - drainage. *For lakeshore �properties the contours should be shown extending 50' into the � <br /> adjacent properties. Provide one copy 8.5" x 11" or 11" x 17"for reproduction. . <br /> � L� Sketches or plans of floor and elevation views (two scaled and one copy 8.5"x 11" or 11"x 17"). <br /> '� * For "rebuild" or "remodel" projects the applicant should provide an additional elevation plan <br /> illustrating the proposed addition/new home envelope overlapping the existing. Additionally, all <br /> �, setbacks should be shown three-dimensionally on the elevation drawings. *see staff for more <br /> information. <br /> � ❑ For rebuild and remodel projects a neighborhood perspective elevation view may be required. <br /> *see sfaff for more information on this requirement. <br /> ❑ Additional items may be requested by City Staff depending on the,scope.of the project. * <br /> ., .: <br /> � APPUCANT'S ACKNOWLEDGEMENT: <br /> s The a licant hereb a rees to <br /> �"� pP y g provide all information requfred or requested by the Planning <br /> Department, agrees to pay additional fees (staff time not covered in the original fee payment) and/or <br /> �� consultant expenses incurred in review of this application and certifies that the information supplied is <br /> 1 true and correct to the best of his/her knowledge. The appiicant recognizes that helshe is solely <br /> responsible for submitting a complete application being aware that upon failure to do so, the <br /> � staff has no alternative but to reject it until it is complete or to recommend the request for � <br /> denial of the request regardless of its potential merit. � <br /> A licant's Si nature: r � �� � � %' •� ra °� <br /> PP 9 "�� ��--':��.�. . Date: � J r <br /> Applicant's Signature: Date: � � <br /> OWNER'S ACKNOWLEDGEMENT: <br /> The owner hereby acknowledges and agrees to this application and further authorizes reasonable <br /> entry onto the property by City Staff, consultants, agents, Commission & Council Members for <br /> purposes of investigation and verification of this request. <br /> Owner's Signature: �� /J �� � '"' <br /> Date: �� ' t f .r � ,. , <br /> Owner's Signature: - ' � Date: � <br /> Applicant must have all submittals into the City offices 25 days before the Planning Commission <br /> . Meeting. Planning Commission Meetings are normally held on the third Monday of each month. <br /> Applicants must be present at all scheduled review meetings of the Planning Commission and <br /> Council. If an applicant is unable to attend a scheduled meeting, please make arrangements to <br /> have an authorized representati.ve attend in place of the applicant and advise the City Planner <br /> assigned to your project. <br /> �.,. � �'' � `��, .a� <br /> . °,, s , <br /> ' �� � , S K�b., <br /> �i; > r • , <br /> � '"v,�. ?'t•:ti. . .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.