. c ' �. <br /> regarding is required,it would require the removal of those evergeen trees on the neighbor's <br /> ProPem'• � . <br /> Mattick stated it is his understanding there are some additional swales that need to be completed <br /> even if the boulder wall remains. � <br /> Hessburg stated he is unsure whether the City Engineer was aware of the turn-around and the <br /> drain tile. Hessburg indicated he is willing to install additional'drain tile if necessary. <br /> Kellogg stated the drainage that was proposed along the north lot line still needs to be constructed <br /> lakeward of the home. - - <br /> Rahn inquired whether the City Engineer relies on a gutter system as the primary means of <br /> handling runoff or whether they like to see the runoff handled in a different manner. <br /> Kellogg stated they need the swales in the event of an emergency and that they did not have the <br /> opportunity to inspect the drain tile system at the time it was being installed. Kellogg stated <br /> another issue is whether the work can be completed this fall. � <br /> Murphy stated Exhibit F in the Staff inemo shows that the building inspector attempted to get in <br /> contact with the applicant and that he did not hear back from him. Murphy questioned why the <br /> City should be mitigating any issues that the applicant has with a potential buyer and that the <br /> buyer should be aware of the issues that exist. - <br /> Mattick stated to his understanding the City would not delay issuing a certificate of occupancy <br /> based on these issues and that the unresolved issues would be between the buyer and the seller. <br /> Hessburg stated he received that letter in January and he immediately called the City and the <br /> landscaper. The City was notified that the landscaper was out of state for three months on <br /> another project. An engineer was retained almost immediately but that he was later told he did <br /> not need a private engineer and that the City would attempt to resolve the issues through the City <br /> Engineer. Hessburg stated he took extra steps to handle the runoff that was created.by the <br /> hardcover. <br /> Kellogg stated his office had been waiting for a significant amount of time for the applicant's <br /> engineer to complete certain work and when that work was not completed,his office offered to <br /> complete a portion of the work. � - <br /> , Rahn moved,Murphy seconded,to send Application No.#OS-3143,Daniel Hessburg,774 <br /> Tonkawa Road,back to the Planning Commission for their review. VOTE: Ayes 5,Nays ' <br /> 0. � <br /> 4 <br />