My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-20-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
08-20-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 11:14:34 AM
Creation date
7/16/2012 11:14:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE#07-3307 ' <br /> 16 August 2007 <br /> Page 2 of 2 <br /> building permit for the house. Orono's building inspector, Bruce Vang issued a stop <br /> work notice and the applicant began working with Planning staff to rectify the situation. <br /> As a result the applicant requested after-the-fact approval rather than revert to the original <br /> plan at the direction of the property owners. � - <br /> Conditional Use Permit Analysis <br /> The�applicant has submitted a revised plan (Plan #4). The applicants applied for their <br /> after-the-fact approval and were permitted to continue working in order to have a finished � <br /> site so the property owners could receive a temporary Certificate of Occupancy, close on <br /> the property and move into their home. This was allowed on the condition that if the City <br /> required changes throughout this process those changes would be completed by the <br /> applicant before a final Certificate of Occupancy would be issued. Plan #4 is the plan <br /> which reflects the existing site conditions. Our engineers have reviewed the progress of <br /> plan revisions and�have generally accepted Plan #4 conditioned upon required revisions. <br /> This plan reflects an enlarged pond which will allow for the property owners to collect <br /> storm water in the proposed pond in order to irrigate their lawn. <br /> Staff Recommendation <br /> Planning staff recommends approval of the conditional use permit; however a number of <br /> issues engineering issues remain outstanding. These should be resolved prior to final <br /> Council approval. Additionally, Staff recommends requiring an "as-built" survey be <br /> submitted for formal approval. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.