My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
07-16-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2012 3:52:53 PM
Creation date
7/5/2012 3:52:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-{��'Y <br /> Memorandum �Bonestroo <br /> 2335 Highway 36 W <br /> To: Darren Amundsen Project: Orono Office Park Date: 7/3/2007 St.Paul,MN 55113 <br /> From: John Smyth Client: City of Orono Tel 651-636-4600 <br /> Fax 651-636-1311 <br /> Re: Wetland Buffer Ordinance Compliance File No: 000139-07000-1, Plat ,�,,bonestroo.com <br /> 07-3303 <br /> Remarks: <br /> The proposed project involves the development of an office park. There is a wetland located on the southern portion of <br /> the property which is classified as a Manage 3. Under the City's wetland ordinance this classification requires a 15 foot <br /> , buffer of native vegetation upslope of the delineated wetland boundary. The setback from the buffer for structures is 20 <br /> feet. <br /> The current proposed plan includes grading in a portion of the buffer. A landscaping plan needs to be developed that <br /> includes native vegetation within the buffer. The plan should be submitted to the City for approval. Given the length of <br /> slope and steepness it is recommended that the buffer of native vegetation is wider if feasible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.