Laserfiche WebLink
, '• y <br /> PC - Exhibit G <br /> Proj ect . <br /> Developers, Inc. <br /> July 12,2007 <br /> Michael Gaf&on <br /> Planning Director <br /> P.O. Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: Orono Business Park(07-3303)ponding revisions <br /> Mike, <br /> I had our civil engineer look at the best way to address the comments from Darren Amundsen <br /> related to storm water runoff and ponding. He has developed a slight modification of the <br /> site/grading plan that switches the pond and the parking on the southwest portion of the site, and it <br /> appears to address the ponding and retaining wa11 concerns. He has done a preliminary evaluation <br /> of the storm water calculations and feels the revised plans will address the concerns that were <br /> raised. <br /> I would like to submit the attached"Alternate A" site plan for review by the planning commission, <br /> � and if the Planning Commission prefers that layout,have their recommendation include reference <br /> to the Alternate plan as well as a stipulation that we receive the city engineers approval of the final <br /> plans and storm water calculations. <br /> Please ca11 if you have any questions. <br /> Sincerely, <br /> Project Developers, Inc. <br /> �� � ��� <br /> Terry Schneider � <br /> Cc Adam Ginkle <br /> Doug VanOrden <br /> 435 Ford Road email terryschn@qwest.net <br /> Suite 349 (952) 545-0505 <br /> St.Louis Park,Minnesota 55426 Fax(952)746-7971 <br />