My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-18-2007 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2007
>
06-18-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2012 3:39:42 PM
Creation date
7/5/2012 3:39:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> PC E.xhibit G <br /> 2335 Highway 36 W <br /> St.Paul,MN 55113 <br /> Te1651-636-4600 <br /> Fax 651-636-1311 <br /> wuvw.bonestroo.com <br /> June 4, 2007 �Bonestroo <br /> Ms. Evelyn Turner <br /> Planner <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: 4055 Elm Street . <br /> File No. 000139-07000-1 <br /> Plat No. 06-3191 <br /> Dear Evelyn; <br /> We have reviewed the survey for the proposed home construction at 4055 Elm Street dated 8-4-94. We <br /> previously reviewed and commented on this application in September of 1994. We have the following <br /> comments with regards to engineering matters: <br /> • This property is located at the natural high point of this area containing mature trees. Construction <br /> of a home at this high point will generate more runoff directed at the neighboring properties, In <br /> 1994 the applicant proposed gutters and downspouts connected to a drain pipe that would <br /> discharge to the city right-of-way,This concept should help mitigate the drainage issues and a <br /> more detailed storm sewer design should be submitted for further review. <br /> • Runoff generated by the proposed driveway should be contained on the lot and discharged to the <br /> Elm Street ditch as well. <br /> • The applicant should design the area currently described as a sediment basin as a rain garden, ' <br /> • Final plans should include erosion and sediment control details. <br /> Once this information is received we can perform a more detailed review of the proposed project. If you <br /> have any questions, please call me at(651)604-4894. <br /> Yours very truly, <br /> BONESTR00 <br /> �— . � . <br /> Darren Amundsen <br /> Cc Tom Kellogg � <br />
The URL can be used to link to this page
Your browser does not support the video tag.