My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-18-2007 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2007
>
06-18-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2012 3:39:42 PM
Creation date
7/5/2012 3:39:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILE#06-3291 <br /> June 18,2007 <br /> Page 3 of 3 <br /> land is available for acquisition and the applicant has demonstrated that all other <br /> requirements can be met. The lot was legally created prior to adoption of the current zoning <br /> standards, which require 1 acre and 140 feet of width. <br /> The surveyor provided a revised plan in response to the City Engineer's comments that <br /> generally responds to the comments. The detailed drainage plan, including drainage <br /> � calculations and rain garden design, should be provided before the application is considered <br /> by the City Council. <br /> This driveway should be paved to keep gravel out of Elm Street. This should be a specific <br /> condition as the code provision is not as clear as it could be. <br /> Are there any other issues or concerns with this application? • <br /> Staff Recommendation <br /> Planning Staff recommends approval of the variance subject to: <br /> 1. Approval of the final drainage plan by the City Engineer before the application is <br /> considered by the City Council. <br /> 2. The driveway being paved. � <br />
The URL can be used to link to this page
Your browser does not support the video tag.