My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-21-2007 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2007
>
05-21-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2012 3:26:55 PM
Creation date
7/5/2012 3:26:40 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
View images
View plain text
MINUTES OF TI�E <br /> ORONO PLANNING COMNIISSION MEETING <br /> Monday,Agri116,2007 <br /> . 6:00 o'clock p.m. . <br /> � (#07-3262 James and Corrine Beck,Continued) <br /> Alexander stated if the lower level is uninhabitable according to the building code,it should not be <br /> considered a level. <br /> Kempf stated he would like to see the height of the building reduced to two and a half stories given its <br /> � close proximity to the lake and the appearance of massing on the lot. � <br /> Alexander stated the proposed structure is already close to the lakeshore. <br /> Kempf stated it would be expanding a nonconfornuty. <br /> � Beck stated they attempted to meet the direction of the applicants from the last meeting and that they <br /> have designed an atiractive house. Beck stated it seems that every time they appear before the Planning <br /> Commission a new direction is given. ' <br /> Berg inquired whether the two and a half story limit was mentioned previously. <br /> � � Beck stated it is news to him and that the space in the basement is not habitable. <br /> Ctirtis stated the applicants were directed to lower the total peak height and that the expansion of the <br /> structure should not extend up to the upper story. � <br /> Gaffron inquired how the uninhabitable spaces would be used by the properiy owner. <br /> Beck stated it would be open space and used for storage. <br /> Alexander stated it allows them access to the house from the garage. - <br /> Berg inquired whether those rooms would be finished. <br /> Beck stated they would not be finished. <br /> Kempf stated in his view the applicants did respond to the direction of the Planning Commission <br /> Chair Kempf opened the public hearing at 7:10 p.m. <br /> There were no public comments regarding this application. <br /> Chair Kempf closed the public hearing at 7:10 p.m. � <br /> � Kempf moved,Kang seconded,to recommend approval of Application#07-3262,James and <br /> Corrine Beck, 3820 Cherry Avenue, granting of a lake setback of 41.3 feet for the house and 29 <br /> feet for the deck, a side setback variance,hardcover variances, and a height variance. VOTE: <br /> Vote 4,Nays 2,Berg and Kroeger opposed. <br /> PAGE 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).