My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-19-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
03-19-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 4:41:09 PM
Creation date
6/19/2012 4:40:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. . � <br /> � - <br /> #04-2974 Stonebay Outlot A <br /> . CMP Amendment Text . � `� ���""� � <br /> April 15,2004 <br /> Page 1 <br /> Amendment to 2000-2020 CMP Text�ts Annroved by City Council 4-12-04 <br /> Part 1. The text below is excerpted directly from the 2000-2020 Conmlunity Management Plan <br /> as an introduction to the proposed amendment teat wliich follows as Part 2. Deletioiis and <br /> additioiis to the existing text are sliown in bold s#��ee�r�/underline format. <br /> Land Use Plan, CMP Section 3B,Pages 38-37 thru 3B-40 <br /> "Urban Commercial Land Use <br /> Urban commercial development is limited to two areas which are provided with all the <br /> necessary urban services and facilities. The major conlniercial center of Orono will <br /> contimie to be the crossroads center of Navarre. This area will provide sufficient <br /> opportunity for neighborhood retail and service businesses, plus adequate professional <br /> offices, to serve tlie needs of inost Orono residents. Accessory fiinctions such as offices <br /> and owner-occupied living units or limited inulti-family developments will be considered <br /> appropriate in or near the Navarre cormnercial area. The scale and type of retail uses in a <br /> pedestrian-friendly environment is the inost inlportant development paraineter for the <br /> Navarre conimercial area. The City wi11 eiicourage redevelopment of individual <br /> commercial sites in Navarre to allow for an exparided range of neighborhood services and <br /> local sniall busiiiess opporhinities. <br /> An additional commercial area is designated along Highway 12 where the availability of <br /> transportation aud utilities as well as proximity to similar commercial developments in <br /> Oroiio and Long Lake,nlake conunercial use appropriate. <br /> Orono will seek to coordinate its conunercial development planning related to the <br /> Highway 12 area with the City of Long Lake to ensure the Long Lake dov�nitown area <br /> reiiiains vital and viable, to focus retail development in a compact downtown retail area, <br /> and to}��#limit the extension of retail development west of Willow Drive in Orono. <br /> Tlie retaii development in the Highway 12 area will be conununity/neighborhood scale <br /> rather thau `big box' regioiial scale development. The types of retail uses will be those <br /> that focus on providing services to the residents and busuiesses of Long Lake and Orono, <br /> � while also drawing fioin the traffic streain tllat will be on cturent Highway 12 after the <br /> Highway 12 Reroute is open. However, the retail developnlent is iiot to draw substantial <br /> traffic fronz beyond Orono. <br /> The development plans for the Highway 12 area will encourage locally-owned and <br /> operated businesses that provide services to Orono and Loiig Lake residents. <br /> Additionally, the Highway 12 retail area will be a pedestrian-friendly area. Tlus involves <br /> providing t�ails/siciewalks alon�tlle roadways provid'uig access to the retail uses. It also <br /> involves providing public amenities that provide a sense of place and provide a gatliering <br /> place for the public." <br />
The URL can be used to link to this page
Your browser does not support the video tag.