My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
02-20-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 4:09:29 PM
Creation date
6/19/2012 4:09:12 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE • <br /> ORONO PLANNING CONIMISSION <br /> • Tuesday,Jlnuary 16,2007 � <br /> 6:00 o'clock p.m. <br /> (#07-3254 MetroBuilding,Continued) ' <br /> Leint�z stated Uased on an interior view, the engineer felt fihe foundation was in good condition. <br /> Rahn stated typically the City requires a let�ter from the engiiieer regarding the foundation�rior to work <br /> connnencing. , <br /> Zullo inquired if 50 or 60 percent of the foundation has to Ue redone whether�the applicant would need to <br /> . • come back before the Plaruiing Commission or whether they could still proceed forward. . <br /> Gaffi•on stated there have been a few cases in the past where a Uigger portioil of the foundation has had to <br /> be replaced and that the City now requires a letter from the engineer certifying tl�at the foundation is in <br /> good condition prior to construction conunencing. • <br /> � Zullo inquired whether the application should be tabled to verify the foundation. <br /> Curtis stated verification of the foundation was one of her recorninendations. � <br /> Rahn inquired whether the elevation of the baseinent would also be lowered. <br /> Leintz stated the elevation of the basement would be raised to eight feet. <br /> I��oeger recominended the survey be redone showing what exists. <br /> Leintz displayed the Ulueprints showing the deck as it existed. . <br /> Ralul noted an e-n�ail was received from John Horoshak dated January 16,stating that he would have a <br /> problem with the variance if it hinders his lake view. • <br /> Rahn opened the public hearing at 8:23 p.in. <br /> � There were no public coizunents regarding this application. . <br /> Ralin closed the�uUlic liearing at s:23 p.m. <br /> Ketupf moved,Winer seconded,to table Application#07-3254,MetroBuilding Company on belialf <br /> of Guardia Development Group,940 North Arm Drive. VOTE: Ayes 7,Nays 0. . <br /> *7. #07-3256 MATTHEW AND KATHY DOLLIFF,2680 PHEASANT ROAD,VARIANCE - <br /> Ralui movecl,Kempf seconded,to recomuie�id approval of Application#07-3256,Mattlie�v na�d � <br /> . Kathy Dolliff, 2680 Pheaslnt Road, granting of a revisiou to tlie hardcover variance 1p�roved in <br /> #02-2754,subject to the removal of the portion of the driveway lying closer to the side lot line than <br /> the sicle wall of the garage extended 1nc1 �lso subject to the proposed hardcover removals. <br /> � VOTE: Ayes 7,Nays 0. ' <br /> PAGE 1G <br />
The URL can be used to link to this page
Your browser does not support the video tag.