Laserfiche WebLink
t - <br /> � . 1WIINUTES OF THE <br /> ORONO PLANNING COMMISSI.ON <br /> � Tuesday,February 20,2007 . <br /> 6:00 o'clock p.m. <br /> ' (#07-3250 Philip Carlson,Continued) <br /> Kroeger inquired whether the plantings would all be located on the Amber Woods site. <br /> Shopek stated all the plantings would be located on the Amber Woods site. <br /> Rahn stated the applicants have adequately addressed his concerns. Rahn inquired whether the _ <br /> � applicants have any samples of the building materials. <br /> Carlson stated she did not bring along samples but displayed a colored rendition of one of the units. <br /> Carlson stated all of the units would be constructed of the same materials. <br /> Kempf stated in his opinion the rock surface would be a better choice. Kempf inquired whether the , <br /> , area by the sign located below the entry driveway would be surrounded by trees. <br /> Carlson indicated there would be three deciduous trees planted in that area which are located further <br /> away from the sign that what is depicted and that the trees would also be higher than the sign. . <br /> Shopek stated they would add some screening along the wall. <br /> , Kroeger noted a neighbor had requested at the previous meeting that the hill not be tampered with. • <br /> Kempf noted the applicants are using up almost all of their signage allonnent with the monument sign, <br /> which would only leave approximately one square foot of signage on each building. Kempf suggested <br /> the applicants consider revising the size of the signage on each of the buildings. <br /> Carlson stated the end part of the monument is really a column with a light on top and that she is not <br /> considering that as part of their signage allotment. Carlson stated they were plannin�on numberin� <br /> the buildings rather than having a big sign denoting the business on each building. <br /> Kempf inquired whether Staff is okay with that type of signage on the buildings. <br /> Curtis stated that is fine. <br /> Zullo inquired whether there are any issues with the drainage since the elevation has been lowered. <br /> Gaffron stated the City Engineer did not specify any particular drainage and/or grading issues and that <br /> he does not anticipate any problems with the drainage. Gaffron stated the entire parking lot drains to a <br /> storm sewer system. <br /> Zullo inquired whether there are any concerns with drainage along the back of the retaining walls. <br /> Gaffron stated that is a gradual slope. <br /> PAGE 5 <br />