My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-2006 Planning Commission Packet
Orono
>
Planning Commission
>
2006
>
09-18-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 11:52:42 AM
Creation date
6/13/2012 11:52:03 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. , � <br /> � O � ` <br /> O �, O <br /> �1�k� , _. CI�"�.' of �,li�►ON�� � <br /> . ,� �� ti.... � <br /> � �� � ��� ti <br /> ��� �� i��CG~ RESOLUTION OF THE C17Y COUNCIL <br /> kEsT'1.� . N0. _ .� � '� � <br /> 3. St. Edwards tivas originaiiy �anted Council appro��al for a buildin� permit for a <br /> church on the property in 1966.The church building tivas subsequently constructed, <br /> and has been in use as a church since 1967. However, City records indicate no <br /> formal CUP�vas ever�ran��d for the church use. The church building�vas destroyed <br /> ' by fire in April 2002, and the congregation has decided to rebuild in the same <br /> . location usin�the existin�foundation. , <br /> 4. The church was granted z CUP to permit the use o£a day care/pre-school in July <br /> 1937,makin�use of lotive:leyel spaces in the church buildin�.That CUP remains in <br /> effect. ' . ' <br /> 5. . The existinJproposed b�=_�e�ing location is centered on i�'iis 4+ acre properiy, and <br /> . meetsallpertinentbuildir��setbackrequirements. Thebuildinglocationismorethan � <br /> .26'from de',ineated«�etlar�in the NE and NW corners of the site. Reconstruction <br /> . of a church building on the�ame foundation is acceptable subject to confirmation by <br /> the applicant that the fou��ation can structurally support the proposed nerv building. <br /> 6. Parkin�for the church us� is regulated in terms of minimum number of spaces and <br /> location. The mimber of�+�Ils is determined by the seatin� capacity of the main <br /> assembly roor�, at a rate of 1 stall per 4 seats. The main �vorship area has seating <br /> desi�ated i�r 143 person_,�vith an overflotiv area for an additional�0,totaling ls3 <br /> . persons: � � <br /> Main�,ssembly Roum Seating Capacity: 183 <br /> Required Pzrl:ing Stalis per Seat: 0.2� <br /> . Required P�zlcing Stalls: 46 . <br /> Proposed Parking: ' S9 Stalls � <br /> The cunent parking lot h� approximately SO stalls; the westerly parking tiving is <br /> proposed to be converted��� a bituminous turnaround and a meditation garden, The <br /> � Cityhas no past parkin�i_�nes with St. Edtivards, and the proposed parldng mduchon <br /> will still yield a conformi,�number of stalls.� � <br /> Section 10.61, Subd. 5(A�, requires that "open parkin� spaces on lots must have a <br /> location other than a requ`=�.d yard except that such parking may be located in a rear <br /> yard to tivithin ten feet of:y interior side lot line an�to within ten feet of a rear lot <br /> lin�." The existin� par1:L; lot ranges from 10' to 15' from the southerly lot line. <br /> �Vhile the seath lot line �� a side lot line and not a rear lot line, parking is not <br /> proposed to be relocated.�ae City is aware of no pas�issues�vith tlle�arking on this <br /> site. '• <br /> Paoe 2 of 7 . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.