Laserfiche WebLink
. , . _ �. ,,.. , . .; . <br /> . ' � . , - . " . � <br /> . _ ' , � <br /> . - - , <br /> Rusty Olson's=-Soi1_and Percolation Testing � <br /> . Josep6 J.OLson—MPCA`License#810 � � . � � . <br /> � 11481 Ri�erview Rd.NE,Hanover,MN 5534I . . � � <br /> : - (763)498-8779 <br /> May 14,2006 , <br /> . William Ulrich � <br /> • - 2280 French Creek Circle . • <br /> Orono,Hennepin County , <br /> This on-site sewage trealment system is designed for a type 1 six bedroom home in accordance with the . <br /> Minnesota PoIIution Control Agency Chapter 7080 Other standards. <br /> Due to compacted soils.The soil was dug out under the�existing system and replaced with course sand when � <br /> it was installed.There is an existing 10'x SS' rockbed.The city insp,ector would like to see a 5'x 55' <br /> addition to the existing rockbed.With the new addition to the existing rockbed the new rockbed would be <br /> 15'x 55"or 750 square feet of rockbed.The top of the existing system must be removed.The loam under <br /> the proposed addition must be removed down to the course sand and replaced with clean course sand to the <br /> eleva�ion of the bottom of the existing rocl.�ed.Add the new rockbed addition as per the design and replace <br /> the soil cover. ' <br /> All neighboririg wells are located greater than I00 feet from proposed treatment azea. <br /> Existing tanks may be used upon approval of the local inspector. A new 1250 gallon lift sta#�ion must be <br /> installed.The old 1000 gallon lift station is to be tumed into a septic tank. <br /> A LUG.Variance maybe needed to install an other system. ` <br /> The homeowner will be responsible for periodic monitoring of the other septic system. The monitoring set <br /> � by LUG. <br /> The mitigation plan for this property is pressurized mound�system. � <br /> A water meter will need to be installed in the house. " ? <br /> A pumping chamber will need to be installed to lift the effluent to the treatsnent area. The power supply and _ <br /> switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A <br /> warning device must be installed with light and sound devices;this is in case of a pump failure.Keep all <br /> � heavy equipment off of the proposed treatment areas before and after consti-ucrion. The area around both <br /> ' sites should be fenced offbefore construction. This design is not valid and the system will need to be <br /> relocated if failure to protect the areas proposed for on-site sewage treatrnent occurs. <br /> Nothing other than gray water,(laundry,showers,etc.)human water and toilet tissue would be disposed of <br /> into the septic tanks. . . <br /> Sinc ely � . : - " <br /> .� <br /> Joseph J.Olson _ � . . ; <br />