Laserfiche WebLink
Response to Comments-Cffy Engineer's Review/SubmlNal of Revised Pians June 19,2006 , , <br /> Crystal Bay Business Center-Orono,Minnesota Page 4 of 4 <br /> ■ Tlie access drive to the west of the prol�oserl buil�li�ags should be moved as fa�•bc�ck as possible fi•om <br /> Old C�ystal Bay Road to avoid vehicle stacking problems at the access poi�r.ts. This may reqzrire <br /> movi�tg tlae pf•oposed ba�ildings to the east. . <br /> Based on anticipated queues from the Febniary 13,2006 TIS memo, the throat distances provided <br /> appear adequate. <br /> ■ Old Crystal Bay Road shoa�lrl be a three-lc�ne roadway with a shared lefl ha•�a la�ae across the erltir•e <br /> fr•oratt�ge of tlie project. hi arldition, right turn Imaes shottld be provided i�ito tlte proposed <br /> developnierat. <br /> A three-lane section is acceptable for this section of roadway. It is RLK's understanding tl�at the road <br /> is under construction. RLK has requested plans from the City to verify roadway design. Anticipated <br /> volumes for these right turns range from 0-20 vehicles in the peak hours;the 100-vehicle threshold is <br /> unlikely to be met. Further, analysis shows that,as expected,the delay imposed on northbound <br /> Crystal Bay Road vehicles is at or less than 0.1 second,well within Level of Service A. And since a <br /> traffic signal is in place immediately north of these two site accesses,a large percentage of <br /> northbound drivers are already slowing in order to stop for a red light at the intersection. <br /> Thank you for your assistance in reviewing the enclosed and previously submitted information; it is <br /> anticipated that this application will be heard at the June 19,2006 Planning Commission meeting and <br /> subsequent City Council meeting. Please do not hesitate to contact either Genevieve McJilton of Ryan <br /> Companies (phone 612-492-4334, email�eiievieve.mjilton cr,rvancompanies.coin)or myself(phone 952- <br /> 933-0972, email jsamuel a,rlkinc.com)with any ques�ions regarding this response to <br /> comments/resubmittal. <br /> Sincerely, Enclosures <br /> RLK Incorpor ted ■ Haul Route Exhibit <br /> ■ Revised Preliminary Plans,dated June 19, 2006 <br /> -u (3-full-size sets/ 12-11 x 17 sets) <br /> °r` � <br /> J ep M. Samuel,PE , <br /> Senior Professional Engineer Cc: (Via USMaiI:docaqne�r.ts and I1 x 17 pla�is) <br /> Genevieve McJilton,Ryan Companies US,Inc. <br /> Mark Schoening,Ryan Companies US,Inc. <br /> Vern Swing,RLK Incorporated <br /> G:\Ryan Companies�200G-135-M\ Correspondence\Ld•Cicy Resp Comments-Sub Rev Plans OG-19-OG.doc <br /> 1 <br />