My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-19-2006 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2006
>
06-19-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 10:54:28 AM
Creation date
6/13/2012 10:54:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�f <br /> � <br /> Response to Comments-City Engineer's Review/Submiftal of Revised Plans June 19,2�6 <br /> Crystal Bay Business Center-Orono,Minnesota Page 4 of 4 <br /> ��` The access drive to tlie west of the proposed buildings should be �noved as far back as possible from <br /> / Old Crystal Bay Road to avoid vehicle stacking problems c�t the access points. This may require <br /> moving the proposed buildings to the east. <br /> Based on anticipated queues from the February 13,2006 TIS memo,the throat distances provided <br /> appear adequate. <br /> ■ Old Crystal Bay Road should be a three-lane roadway with a shared left turn lane across the entire <br /> frontage of the project. In acidition, r•iglit tacrn la�ies shoicic�be provided in.to tlie pr•oposed <br /> development. <br /> A three-lane section is acceptable for this section of roadway. It is RLK's understanding that the road <br /> is under construction. RLK has requested plans from the City to verify roadway design. Anticipated <br /> volumes for these right tums range from 0-20 vehicles in the peak hours; the 100-vehicle threshold is <br /> unlikely to be met. Further,analysis shows that,as expected,the delay imposed on northbound . <br /> Crystal Bay Road vehicles is at or less than 0.1 second,well within Level of Service A. And since a <br /> traffic signal is in place immediately north of these two site accesses, a large percentage of <br /> northbound drivers are already slowing in order to stop for a red light at the intersection. <br /> Thank you for your assistance in reviewing the enclosed and previously submitted information;it is <br /> anticipated that this application will be heard at the June 19,2006 Planning Commission meeting and <br /> subsequent City Council meeting. Please do not hesitate to contact either Genevieve McJilton of Ryan <br /> Companies (phone 612-492-4334,email genevieve.mtilton(cr�rvancomuanies.com)or myself(phone 952- <br /> 933-0972, email jsamuel c�rlkinc.com) with any questions regarding this response to <br /> comments/resubmittaL <br /> Sincerely, Enclosures <br /> RLK Incorpor ted ■ Haul Route Exhibit <br /> ■ Revised Preliminary Plans,dated June 19, 2006 <br /> � -u (3-full-size sets/ 12-11 x 17 sets) <br /> ►.� <br /> J ep M. Samuel,PE <br /> Senior Professional Engineer Cc: (Via US Mail: documents and 11 x 17 plans) <br /> Genevieve McJilton,Ryan Companies US, Inc. <br /> Mark Schoening,Ryan Companies US,Inc. <br /> Vern Swing,RLK Incorporated <br /> G:\Ryan Companies�2006-13�-M\ Correspondence\Ltr City Resp Comments-Sub Rzv Plans 06-19-06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.