My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-19-2006 Planning Commission Packet
Orono
>
Planning Commission
>
2006
>
06-19-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 10:54:28 AM
Creation date
6/13/2012 10:54:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i� <br /> �� 0� <br /> 0 0 <br /> . �,. - � CITY of URC�NU <br /> a � <br /> ti <br /> �' 'ti RESOLUTION OF THE CITY COUNCI L <br /> ��`��ESS���G • � N0. . � � 4 �� <br /> Revised plans, indicating removal of the tower shall be approved by the Orono <br /> Council prior to issuance of a building permit. <br /> 4. The Zoning Code requires that the lighting not have a direct source of light visible <br /> from the right-of-way or adjacent land. The parking area and walkways shall be <br /> developed according to the site plan on file with the City of Orono not to exceed 12' <br /> � in height. The cutoff angle of the light shall not radiate light beyond the property <br /> lines. Glare and light trespass shall be prohibited. Lighting plan shall be in <br /> conformance with the approved plans on file with the City of Orono. <br /> 5. The Landscaping shall be completed in conformance with the plans provided and <br /> approved by the City of Orono dated August 23,2000. The types and species have <br /> ' been identified by the planting schedule provided by the applicant. <br /> 6. The driveway access and parking areas shall be constructed to City Standards and are <br /> . subject to final approval by the City Engineer. The�City Council approves the <br /> parking areas to be crushed aggregate material rather than a bituminous surface. All <br /> driveways and the service area shall be bitwminous swrface. <br /> 7. The existing building shall be removed within 60 days of a Certificate of Occupancy <br /> being issued for the new building. Asbestos removal shall be completed with <br /> appropriate State requirements an.d permitting. The Arts Center shall be required to <br /> notify the City of Orono and adjacent property owners prior to beginning asbestos <br /> removaL <br /> 8. AlI construction traffic shall access the property through an entrance located near the <br /> southwest.corner of the site. Because North Shore Drive is a County Road,a permit <br /> . � shall be obtained from Hennepin County approving access to the property., <br /> �9. � Construction traffic shall be limited to a separate entrance so not to interfere with the <br /> everyday traffic using the existing building. <br /> 10. A fence shall be constructed during the entire construction period to separate the <br /> building in use from the new building, . <br /> 1 l. Silt fencing shall be in place prior to and during the construction and grading on the <br /> properly. Final erosion control shall be approved by the City Engineer. <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.