My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-2006 Planning Commission Packet
Orono
>
Planning Commission
>
2006
>
02-21-2006 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 9:55:39 AM
Creation date
6/13/2012 9:55:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2335 West Highw�y 3G ■ St.Paul, MN 55113 � <br /> _ Bor�estroo 1 <br /> Ros�ne OFfi[e:G51-636-4640 ■ F�x;651-636-1311 �-----'--' <br /> Hnderlilc& www,bonestroo,com <br /> - � Associ�tes <br /> Engineers&Architects ' <br /> . ���°�f�'�� <br /> January 6,2006 ,� r'�N � 9 2D�6 <br /> Mr.Mich�el Gaffi•on ����Q/�� <br /> Planning Direclor R�/�/0 <br /> City of Orono <br /> Post Office I3ox 66 <br /> Crystal l3ay,MN 55323 <br /> Re: 3165 North Shore Drive ' <br /> rile No. 000139-OG000-0 � <br /> P11C No.OS-3l 35 • <br /> Dear Mike: � • <br /> • You and I met yesterday with the appliclnt's lrchitect to review the revised plans for the proposed improvemei�ts io 3 I 65 <br /> Nortli Shore Drive.The site improvements include the construction of a.new hoine and associated grading.Tlie following <br /> is a summary of our comments from thal meeting regard'uig Alternate Plan A: <br /> • The revised grading plan has itnproved the situation west of tlie.home with the proposed swale containing <br /> drainage on the subject property. The drainage along the east side of the home will convey water ncross the <br /> neighboring property.Although a note on tl�e plan indicates an easenlent will be necessary,the applicant may <br /> i want to consider some type of a lot line rearrangement with the neiglibor so that an easement is not necessary. <br /> . � • The grading plan should incorporate some type of a swale between the tumaround shown north oftlie l�ome and <br /> the top of the garage so tl�at drainage is not routed over the garage onto the driveway. <br /> � • The proposed retaining wall along the driveway to the garage approaclies 10-feet in height and will requue a <br /> separate engineered design and detail subxnil�al for review aud approval. <br /> • The applicanYs architect inforn�ed us that(he f 11 necessary to complete the grading as sliowt�wil]exceed 2000 <br /> cubic yards.It is vvortli considering moving the proposed home northerly and turning it sliglttly so that tl�e front <br /> of the home is closer to parallel with tl�e sltoreline to minimize the fill necessary and to.iml�rove views to the <br /> lake. . <br /> • Tl�e applicant sliould comn�ission a geotechnicat frm to verify existing soil conditions and certify that tl�e <br /> existing foundation is adequate to support the proposed improvements.Soils in this area may be marginal and <br /> ihe applicant should at le�st detem�ine wlielher or not pilings will Ue necessary. <br /> • Pre and post construction drainage calculaiions should be provided i�or the 2, 1 U,and 1 UU-year storm evenls. <br /> PosL construclio.n discharges of,f site sh�ll nol exceed exisiing discharges. • <br /> I�f you h�tve atry queslions ple�se call me at(651)604-4863. <br /> Yours vecy tculy, <br /> . ]30N�STIR00,ROSLN�,AND�RLIK 8c ASSOCIA7'�S,:[NC. <br /> _� <br /> �47Y,� • <br /> Tom Kellog6 . <br /> ) Cc: Greg Gap��a,City of Orono � <br /> St. P�ui, St. Cloud, Rochester, MN ■ Milw�ul<ee, WI ■ Chicago, IL <br /> Affirmative Action/Equal Opportunity Employer�nd Employec Owned <br />
The URL can be used to link to this page
Your browser does not support the video tag.