My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-P11904 - gazebo
Orono
>
Property Files
>
Street Address
>
F
>
Fagerness Point Road
>
1725 Fagerness Point Road - 17-117-23-22-0036
>
Permits/Inspections
>
2008-P11904 - gazebo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:33:32 PM
Creation date
8/1/2016 10:24:32 AM
Metadata
Fields
Template:
x Address Old
House Number
1725
Street Name
Fagerness Point
Street Type
Road
Address
1725 Fagerness Point Road
Document Type
Permits/Inspections
PIN
1711723220036
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIPS & TIME SAVERS <br /> � � 6 <br /> �''•o�� FOR RECEIVING PRODUCT AND INSTALLATION <br /> "wheR Qvs��tr Car*+es�.st• <br /> SET UP <br /> RECOMMENDED TOOLS <br /> ❑ Cordless driil/batteries ❑ Tape (50') <br /> ❑ Hammer ❑ Side cutters <br /> ❑ Pry bar ❑ 8' ladder <br /> ❑ Phillips head screwdriver ❑ Box cutter/knife <br /> ❑ Standard head screw driver ❑ 120 grit sand paper <br /> ❑ Level ❑ Touchup stain (included) <br /> Y All gazebo products MUST be installed on a hard and level surface. <br /> 1. SKIRTS - Lay out all the skirts. It takes two skirts for every 100" wall and one skirt <br /> for every 50" wall. Once the skirts are laid out, take a round corner post and attach <br /> a skirt (if the enclosure has options, such as a bay window, sitting bay window, or <br /> alcove room, check the layout diagram to determine the position of the options). <br /> Attach all remaining skirts. <br /> 2. WALLS - Install the walls and door assembly. <br /> 3. SQUARE THE GAZEBO - Now square the gazebo before attaching the top plate. <br /> To square the gazebo, measure from one round corner to the opposite round <br /> corner. Repeat the process with the other two corners, measuring as X. The <br /> measurements should be within '/4" of each other. <br /> ➢ A good "double check" is to make sure the doors close correctly and the <br /> windows run smoothly in their track. If the gazebo is not squared, you will have <br /> trouble with both. <br /> 4. TOP PLATE - Once the gazebo is square, install the top plate on the walls, <br /> starting at one corner, and screwing down the top plate per assembly instructions. <br /> 5. WALL BLOCKS - Once the top plate is secure, put the wall blocks on the top plate <br /> (rafters will rest against these). Refer to the Assembly Instructions for block <br /> placement. Screw down the wall blocks and you are ready for the dome box and <br /> rafters. <br /> ➢ TIME SAVER: Do not secure rafters to wall blocks until after the roof panels <br /> are installed, as you may need to move rafters to ease placement of panels <br /> for "fit". <br /> GAZEBO WORKS TOO,INC. <br /> PO Box 5257, Central Point, OR 97502, USA Updated: 11/16/06 <br /> (541)664-2000 FAX: (541)664-6189 <br />
The URL can be used to link to this page
Your browser does not support the video tag.