Laserfiche WebLink
� Plan Review Checklist for tVew Structures / Additions <br /> Address/ PID / LegaL Z'-1`-1(� E-T-}F�[ A� � <br /> Description of work: _ �C � �r c.u��,�� �x �,o,n�s r <br /> Septic review by: _ /�/l� Qate Approved: <br /> Zoning review by: n// Date Approved: <br /> Building review by: Date Approved: //- Z�, i� <br /> Grading review by: /�/1�4 Qate Approved: <br /> Z ing File#: Resolution #: Resolution Date: <br /> Zonin District � Fire De artment Post Office School District <br /> Zoning: Lot Area: SF /AC Width: Depth; <br /> Survey Sub �tted: ❑ Yes ❑ No Date of Survey: <br /> Pro osed Setba s: <br /> Front (Lake) Rear(Street) ( N S E W ) ( N S E W ) Ot,t�'er Buildings Wetland <br /> � Side Side �' <br /> � <br /> Building Defined Height: Building Peak Height� � <br /> FOR A BUILDING WITH A BASEMENT O CRAWL SPACE: FOR A,�UILDING ON A SLAB FOUNDATION: <br /> START � the distance between e basement floor/ S ART the distance between the stab and the <br /> WITH crawl space floor and th ighest roof peak, ITH highest roof peak, the top of the cornice <br /> the top of the cornice of a roof, the deck of a flat roof, the deck line of a mansard <br /> line of a mansard roof, or the permost roof, or the uppermost point on a round or <br /> oint on a round or other arch-t roof other arch-t e roof <br /> SUBTRACT half the distance between the highe � SUBTRACT ' hatf the distance between the highest <br /> window and highest roof peak of a pit ed � window and highest roof peak of a <br /> � roof itched roof <br /> SUBTRACT the distance between the basem t floor/ ADD the dis;ance between the slab and the <br /> crawl space floor and the high t existing highest existing grade within the <br /> grade within the foundation 10 feet, foundation <br /> whichever is less. I QUALS ' Defined buildin hei ht <br /> EQUALS Defined buildin hei ht <br /> Lot Coverage: SF o�o <br /> Shoreland District � MCWD Permit Received � Average La shore Setback Bfuff <br /> ❑ Yes ❑ No � Yes ❑ No ❑ N/A ' ❑ Yes ❑ No <br /> Permit Number: ❑ Yes ❑ ❑ N/A <br /> Setback: <br /> Hardcover Zon Existin I Proposed Variance Require I CUP Required <br /> �-�� I , ❑ Yes ❑ No ❑ Yes ❑ No <br /> 75-25 j Type�s�: Type�S�: <br /> I 250- 00' � <br /> I 50 -1000' � <br /> REMAR S (in-house): � � ���,' '�' ";_ <br /> Updated: 07/01/2009 <br /> z:\forms\plan review checklist.docx <br />