My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01266 - new structure
Orono
>
Property Files
>
Street Address
>
E
>
Elmwood Avenue
>
1161 Elmwood Avenue - 07-117-23-14-0073 - New PID
>
Permits/Inspections
>
2013-01266 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:31:58 PM
Creation date
7/27/2016 2:34:29 PM
Metadata
Fields
Template:
x Address Old
House Number
1161
Street Name
Elmwood
Street Type
Avenue
Address
1161 Elmwood Ave
Document Type
Permits/Inspections
PIN
0711723140073
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � <br /> 206 Minnetonka Avenue South <br /> I�� Wayzata,MN 55391 <br /> phone 952.746.4380 <br /> fax 952.746.4383 <br /> � � www.colfaxco.com <br /> �"'�9�'"'�`""'�'�O"'�`O�""'���' January 9, 2014 <br /> Christine Mattson, Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: 1161 Elmwood Avenue, Lots 9 & 18 <br /> Dear Christine, <br /> Enclosed you will find the following items which are to be included with the Building permit application <br /> for the above mentioned property: <br /> • Two copies of retaining wall engineering calculations and drawings. <br /> • Two copies of the revised building elevations showing retaining wall locations. <br /> This information is being provided in response to the City Engineers comments that were forwarded to <br /> us by Melanie Curtis. It is my understanding that copies of the revised survey showing the location of the <br /> new retaining wall design have been forwarded to the city directly by Gronberg&Associates. Please be <br /> advised that due the revised building elevations are included with the retaining wall engineering <br /> drawings and are not to scale. Furthermore, these elevations have been revised to meet the City <br /> Engineer's request for more accurate retaining wall location notes and have not changed or modified <br /> � the floor plan, structure or physical appearance of the previously submitted plans. <br /> In late December, Melanie informed me that the Planning Department's review was complete and that <br /> the Building Department had yet to complete its review. In light of the submission of this additional <br /> information as well as the submission of the MCWD permit, I would greatly appreciate it if you could <br /> update me as to the status of each department's review and provide me with an estimate as to when I <br /> can expect the Building Permit to be issued. <br /> If you have any questions or need additional information, please contact me. Again, our thanks to you, <br /> Melanie, Mike and Jesse for all of your help and guidance on this project. <br /> Very truly yours, <br /> Wayne J. Soojian <br /> President <br /> Enc. ����'��� <br /> JAN -9 201�/� <br /> CITY OF ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.