My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Temp COO and COO
Orono
>
Property Files
>
Street Address
>
C
>
Cherry Avenue
>
3926 Cherry Avenue - 08-117-23-33-0019
>
Land Use
>
Temp COO and COO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:44:38 PM
Creation date
7/21/2016 2:50:40 PM
Metadata
Fields
Template:
x Address Old
House Number
3926
Street Name
Cherry
Street Type
Avenue
Address
3926 Cherry Ave
Document Type
Land Use
PIN
0811723330019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> City of Orono <br /> CERTIFICATE OF OCCUPANCY <br /> � TEMPORARY CERTIFICATE � <br /> Building Address: 3926 CHERRY AVE <br /> PIN: 08-117-23-33-0019 <br /> Legal Description: Crystal Bay View <br /> Block 004 Lot 000 <br /> Zoning District: <br /> Permit No: 2014-01447 <br /> Work Activity: Single Family <br /> Construction Type: <br /> Occupancy: <br /> Occupant Load: <br /> Fire Sprinkler: N <br /> Applicant: Stonewood, LLC <br /> Applicant Address: 153 E Lake Street <br /> City,State,Zip: Wayzata, MN 55391- <br /> Owner Name: Kenneth Washuta <br /> Owner Address: 3926 Cherry Ave <br /> City, State,Zip: Mound, MN 55364- <br /> THE FOLLOWING ARE NOTED AS INCOMPLETE OR MISSING. THESE MUST BE <br /> CORRECTED OR COMPLETED AND REINSPECTED WITHIN THE SPECIFIED <br /> NUMBER OF DAYS OR THIS CERTIFICATE WILL BE VOID <br /> Failure to correct these deficiences will cause occupancy violation citations to be issued <br /> , I <br /> To be completed by June 15,2016 <br /> -As-built survey to be submitted and approved showing: <br /> All exterior improvements completed(driveway,etc.)and shown on as-built survey <br /> Final grading completed and shown on as-built survey <br /> -Erosion control to remain in place until sod/vegetation is established <br /> I o make the above corrections and to call for reinspec������e time allowed: <br /> � <br /> e ntractor Date <br /> � ��������� �.;� �l a��� �i j j�" <br /> w mg icia <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.