My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00906 - new structure
Orono
>
Property Files
>
Street Address
>
E
>
Elm Street
>
4055 Elm Street - 06-117-23-41-0106
>
Permits/Inspections
>
2013-00906 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:28:13 PM
Creation date
7/19/2016 12:57:39 PM
Metadata
Fields
Template:
x Address Old
House Number
4055
Street Name
Elm
Street Type
Street
Address
4055 Elm St
Document Type
Permits/Inspections
PIN
0611723410106
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ' . <br /> Erosion Control Suaplemental Information <br /> Final Stabilization will be provided with (seed, sod, etc): ��(��j2..� S��� <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> �Not Applicable �Off site ❑ Indicated on site plans �Other(description): <br /> 5 E L f Cp1�!�'A��H�b n�( �c�Pt�IZ E c�r•�t�,�Y <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone, whichever is greater,of all vegetation to be retained. <br /> � Yes �Not Applicable � Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing '/4 acre or <br /> greater. The inspection requirements are as follows: <br /> 1) The individual identified as being responsible for implementing the erosion control <br /> plan must routinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hours. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> tivriting and these records must be retained with the erosion contro!plan and made <br /> available at the District's request within 24 hours. Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party completing <br /> maintenance activities);and <br /> v. Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name ��� �cN(2�DE(Z <br /> Organization S O�.SD � ��"�1� �bN1 GS 5F' �{ F/V1D,D�Z J�/G <br /> Phone T�o3 ^7$�-3�3�1 Alternate Phone 7"�03 � 3�� ' 74'g�- <br /> Email ,�c�E� So�ic(, qi^o+��cs�nnw►tS • Co� <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> 1 3 /3 <br /> nature o pplicant or Authorized Agent ate <br /> q-b.�5� ��M �Tt���T �Iz��y� � �� � <br /> Project Address <br />
The URL can be used to link to this page
Your browser does not support the video tag.