Laserfiche WebLink
Municode Page 7 of 7 <br /> • . . <br /> Erosion off-site. If erosion breaches the perimeter of the site, the owner shall <br /> immediately develop a cleanup and restoration plan, obtain right-of-entry from the <br /> adjoining property owner and get appropriate approvals from all state, federai, and <br /> local agencies as necessary. Then implement the cleanup and restoration plan within <br /> 48 hours of obtaining the adjoining property owner's permission and approval from <br /> any appropriate state, federal, and local agencies. <br /> (Ord No 55 3rd senes § 9. 4-73-2009 Ord No 69 3rd ser�res. � �I, 4-'l2-?_01aj <br /> Sec. 79-10. Completion of work. <br /> Work will be considered complete when all exposed soil areas have undergone final <br /> stabilization, as defined in st:�cticn_7��__.5, is constructed to finish grade, and is in conformance with <br /> all permit conditions of approval to the satisfaction of the city. The owner shall notify the city when <br /> the land disturbing operations are ready for final inspection. Final approval shall not be given until <br /> all work, including installation of all drainage facilities and their protective devices, and all erosion <br /> control measures, have been completed and final stabilization has occurred in accordance with this <br /> chapter. <br /> ((7rzi No 55 3rd Senr��s c 1. 4-13-2009; Ord. No 69�rd s�,�ie.e � 7 �-?�-2OtCi <br /> http://library.municode.com/print.aspx?h=&clientID=13094&H1�MRequest=http%3a%2t�/o... 9/3/2013 <br />