Laserfiche WebLink
� �°�o <br /> C ITY OF ORONO <br /> � � Street Address: Mailing Address: 7elephone(952)249-4600 <br /> ��, � 2750 Kelley Parkway P.O. Box 66 Fax (952)249-4616 <br /> �,y �,�' Orono, MN 55356 Crystal Bay, MN 55323 www.ci.orono.mn.us <br /> kFsxo� <br /> May , <br /> Tom Betz <br /> Betz Buiiders, Inc. <br /> 300 Crestview Ave <br /> Long Lake, MN 55356 <br /> Re: Building Permit Application#2016-00453 <br /> 3625 Eileen Street <br /> On April 29, 2016 the City received a building permit application for an oversized accessory structure. Staff conducted <br /> a preliminary review based on the information provided and recommends the following items be submitted or revised <br /> in order for your application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. A survey dated 4-28-16 was submitted with the application. According to City Code <br /> Section 78-1434 (copy enclosed) accessory structures over 1,000 square feet are considered oversized and <br /> must meet principal structure setbacks. Please have the survey updated to show the structure a minimum of <br /> 50'from the property lines and any proposed grading. <br /> 2. Oversized Accessory Structure. Accessory Structures over 1,000 square feet require the filing of a restrictive <br /> covenant in the chain of title for the property to govern the use of the building. Attached is an example of <br /> what the Declaration of Restrictive Covenant will look like. Because the document will be recorded against the <br /> property we require the full legal name(s) of all property owners to be provided because all interested parties <br /> must sign the declaration. <br /> 3. Landscape Plan. Will there be any landscaping with the proposed accessory structure? If so,the City requires <br /> �� a landscape plan be submitted showing all the proposed exterior/landscaping improvements, i.e. patios, <br /> g ading, sidewalks, retaining walls, etc. The plan should include the name of the individual performing the <br /> work. Any proposed patios, grading, sidewalks, retaining walls shown on the landscape plan should also be <br /> reflected on the survey. <br /> 4. HardcoverCalculations. The property is located in Tier 1 of the Stormwater Quality Overlay District. Hardcover <br /> calculations were submitted with the building permit application, but please submit updated hardcover <br /> calculations with the updated survey. <br /> 5. Minnehaha Creek Watershed District (MCWD). Your project may trigger the Minnehaha Creek Watershed <br /> District's (MCWDsj permitting requirements; please contact the MCWD directly at 952-471-0590 regarding <br /> your project. Please note,the City of Orono will not issue a building permit without a copy of the MCWD permit <br /> or documentation stating the proposed project does not trigger any of their permitting requirements. <br /> Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on <br /> the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> � <br /> hristine Mattson <br /> Planning Assistant <br /> c via email Tom Betz <br /> Bob Ryan <br /> Roger Peitso, Building Official <br /> enclosures <br />