Laserfiche WebLink
Boulder Retaining Wall Evaluation <br /> Project VEC 14-067 <br /> March 21, 2014 <br /> Page 2 of 2 <br /> Conclusions <br /> Based on the visual observations, it appears the boulder retaining wall was constructed in general <br /> accordance with industry standards and appear to be performing adequately at the time of the <br /> observations. The evaluation of the tallest cross-sections indicate the required factors of safety <br /> have been met. <br /> General <br /> Services performed by VEC personnel on this project have been conducted with that level of <br /> care and skill ordinarily exercised by members of the profession currently practicing in this area. <br /> No warranty, express or implied, is made. Thank you for using the services of VEC. If you have <br /> any questions about this letter, please call me at 952-465-8272. <br /> I hereby certify that this plan,speci�cation, or <br /> report was prepared under my direct supervision <br /> and that I am a duly Licensed Professional <br /> Engineer under the laws of the State of Minnesota. <br /> Ronalcf'��Vickery, PE <br /> President/Principal Engineer <br /> Registration Number: 24065 <br /> March 21, 2014 <br />