Laserfiche WebLink
y <br /> pop-up drain, lever handles, 4" centers. <br /> b. Toilet - Kohler Handicapped Lite Toilet. Elongated Bowl. Finish white. <br /> Chrome trip lever. Provide cast iron stack for sound deadening at this <br /> toilet. <br /> c. Tub - Kohler #K-863, 6' bath or K-850, 5' bath; cast iron. Finish: white. <br /> Trim, accessories & drain chrome. <br /> � Tub Faucet - Moen #T-950/97372; 4999 or 4997 rough-in valve; Moen <br /> #3856, chrome Hand-held Deluxe Spray shower head w/ 24" slide bar & <br /> separate control to match above; Finish, Chrome; Lever handles; verify <br /> configuration w/ Owner. <br /> 3.1 xecution <br /> 1. Perform all work in accordance w/ codes & ordinances & include all labor <br /> & materials as required for complete installation. <br /> Section 1550 - HVAC <br /> 1.1 Sco�e - Provide new heating & air/cond. system for new addition & all <br /> fittings, ductwork & accessories. See Keynotes, Section 0195, for total scope of <br /> work. <br /> 1.2 Submittals - Submit brochure cuts for all items to be furnished for Owner <br /> approval including floor & wall register types. <br /> 2.1 Products - <br /> 1. Provide new heating & air/cond. distribution system for <br /> addition/remodeling areas, verify w/ Owner location of supply & return <br /> air grilles prior to performing work. Provide heat vents to crawl spaces. <br /> Provide the following HVAC equipment for natural gas system. <br /> a. Furnace at new addition - Lennox #G26Q3-50, 50,000 output (verify <br /> capacity for project), 92% AFLJE, sealed combustion,. Vent thru roof. <br /> c. Air Conditioner for new addition - Lennox #HS26-024; 2 ton, 24,000 <br /> Btu, 13 SEER, central A/C. <br /> d. Options for furnace air cleaner - Honeywell #F50-16x25 electronic air <br /> cleaner; or Spacegard #2400 media style air cleaner. <br /> e. Humidifier - Aprilaire #560 - automatic humidifier, bypass style; verify <br /> w/ Owner. <br /> 2. Refer to Keynotes #51,76, &78. <br /> 3. Modification to existing distribution system as required by remodeling, <br /> site verify. <br /> 4. Provide all necessary connections & fittings for complete installation. <br /> 5. Provide new supply & return air grilles as required by remodeling, verify <br /> locations as noted. Patch existing locations to be vacated. <br /> 7. Refer to Keynote #78 for dryer vent. <br /> 33 <br />