My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009444 - addition
Orono
>
Property Files
>
Street Address
>
E
>
Edgewood Hills Road
>
1045 Edgewood Hills Road - 02-117-23-41-0003
>
Permits/Inspections
>
1997-009444 - addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:10:19 PM
Creation date
7/14/2016 12:30:13 PM
Metadata
Fields
Template:
x Address Old
House Number
1045
Street Name
Edgewood Hills
Street Type
Road
Address
1045 Edgewood Hills Rd
Document Type
Permits/Inspections
PIN
0211723410003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Apply three-ply Kraft paper between subfloor & wood floor. <br /> 4. Verify finish floor elevation to maintain w/ other finish floor material. <br /> 5. See plans & Keynotes for any special trim, direction & details of flooring & <br /> steps, nosing, risers & transition strips. <br /> 3.1 Execution <br /> � 1. Glue w/ construction adhesive & nail any plywood or other subfloor to <br /> floor joists w/ galvanized nails or ring-shanked nails or drywall scsrews. <br /> See Keynotes. <br /> 2. Verify stabilized moisture content of wood flooring before installing, <br /> according to recomm. level. Install under proper humidity conditions as <br /> required for minimum movement of boards. Leave proper expansion <br /> gaps at perimeter areas to allow for movement of wood seasonally. <br /> �ection 0965 - Vinyl Flooring <br /> 1.1 co e - Furnish & install new vinyl flooring. Refer to Room Finish Schedule <br /> & Keynotes. <br /> 2.1 Products - Furnish labor & materials for the installation of vinyl sheet <br /> flooring in room 106. Remove existing & clean substrate as required. <br /> 3.1 Execution - Install all materials in accordance w/ manufacturer's <br /> recommendations. Repair/replace existing subfloor as required to receive <br /> new finish. <br /> Section 0968 - Carpet <br /> 1.1 Sco�e - Furnish & install new carpet & pad. Refer to Room Finish Schedule. <br /> Install accord. to industry requirements & recomm. Remove existing floor <br /> materials as required. <br /> 2.1 roducts <br /> 1. Carpet - Provide a $30 per sq. yd. cost allowance for carpet & pad material. <br /> Section 0990 - Painting <br /> 1.1 Scope - Refer to Room Finish Schedule, & Section 0195 for complete work. <br /> Work to include painting & finishing all unfinished interior & exterior <br /> surfaces as required. Exterior work to include all new construction. Interior <br /> work to include all new walls, ceilings & all new millwork, except where <br /> wallpaper is noted. <br /> 2.1 Products - The following outlines surfaces to be painted, the Contractor shall <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.