Laserfiche WebLink
3. Apply three-ply Kraft paper between subfloor & wood floor. <br /> 4. Verify finish floor elevation to maintain w/ other finish floor material. <br /> 5. See plans & Keynotes for any special trim, direction & details of flooring & <br /> steps, nosing, risers & transition strips. <br /> 3.1 Execution <br /> � 1. Glue w/ construction adhesive & nail any plywood or other subfloor to <br /> floor joists w/ galvanized nails or ring-shanked nails or drywall scsrews. <br /> See Keynotes. <br /> 2. Verify stabilized moisture content of wood flooring before installing, <br /> according to recomm. level. Install under proper humidity conditions as <br /> required for minimum movement of boards. Leave proper expansion <br /> gaps at perimeter areas to allow for movement of wood seasonally. <br /> �ection 0965 - Vinyl Flooring <br /> 1.1 co e - Furnish & install new vinyl flooring. Refer to Room Finish Schedule <br /> & Keynotes. <br /> 2.1 Products - Furnish labor & materials for the installation of vinyl sheet <br /> flooring in room 106. Remove existing & clean substrate as required. <br /> 3.1 Execution - Install all materials in accordance w/ manufacturer's <br /> recommendations. Repair/replace existing subfloor as required to receive <br /> new finish. <br /> Section 0968 - Carpet <br /> 1.1 Sco�e - Furnish & install new carpet & pad. Refer to Room Finish Schedule. <br /> Install accord. to industry requirements & recomm. Remove existing floor <br /> materials as required. <br /> 2.1 roducts <br /> 1. Carpet - Provide a $30 per sq. yd. cost allowance for carpet & pad material. <br /> Section 0990 - Painting <br /> 1.1 Scope - Refer to Room Finish Schedule, & Section 0195 for complete work. <br /> Work to include painting & finishing all unfinished interior & exterior <br /> surfaces as required. Exterior work to include all new construction. Interior <br /> work to include all new walls, ceilings & all new millwork, except where <br /> wallpaper is noted. <br /> 2.1 Products - The following outlines surfaces to be painted, the Contractor shall <br /> 30 <br />