Laserfiche WebLink
Vanity at room 103 to extend wall-to-wall under shelving, 7'- 2"1.±. <br /> #88C - Room 107 & 108, butternut veneer cabinet top w/ hardwood nosing <br /> thickness & profile to match existing. <br /> 89. 1 1/4" o.d. pipe railing w/ pipe rail supports w/ 1"concealed pipe <br /> fastenings as located; paint. <br /> 90. Concrete block wall to exposed & painted to match. <br /> 91. 1/4" thick full length mirror mounted on back of door, provide chrome <br /> trim all sides. <br /> 92. Structural Engineering completed by Mattson MacDonald Inc., Wes <br /> Mattson; 827-7825. <br /> Division 2- Division 14 - General Construction <br /> Section 0211 - Demolition And Removal <br /> 1.1 co e - Work includes all demolition & removal work on the site as is <br /> Inecessary to accommodate the new construction & disposal of all removed <br />,' materials & equipment; including mechanical & electrical work. Refer to <br /> Section 0195. Patch all areas disturbed during construction for new wiring, <br /> plumbing, structure, etc. Existing construction that is to remain which is <br /> damaged by the work shall be replaced at no additional cost. Coordinate any <br /> materials & equipment to be salvaged & turned over to Owner & relocated, or <br /> removed, as per Owner's direction. Contractor shall visit site to inspect <br /> existing conditions to determine total scope of work. <br /> Section 0220 - Earthwork <br /> 1.1 c e - Work includes all necessary excavation, compacted fill, backfill, <br /> granular compacted base fill for concrete slabs, rough grading finish grading, <br /> granular fill with drain tile, granular backfill & topsoil w/ sod to restore areas <br /> disturbed by construction to original condition. Refer to Section 0195 for <br /> complete work. Contractor to verify location of any buried utilities prior to <br /> beginning excavation or demolition work. Contractor to restore site <br /> including landscape areas to existing conditions & replace any materials <br /> damaged during construction. Remove any organic soil materials from <br /> below new slab-on-grade conditions. See Section 0110. <br /> Section 0320 - Concrete Reinforcement <br /> 1.1 co e - Work includes fabrication & placement of reinforcement for cast-in- <br /> place concrete & masonry work. Refer to Keynotes, Secion 0195. <br /> 2.1 roducts <br /> 1. Reinforcing Bars - New billet steel, deformed bars, ASTM A 615, grade 60 <br /> 16 <br />