Laserfiche WebLink
accessories as req. for complete installation. See alternates for additional <br /> plaster work. <br /> 23. 1/2" gypsum board, provide all metal corner & edge trim as required; <br /> provide 5/8" gypsum board at ceiling w/ joist/rafter spacing 24" o.c. Glue <br /> w/ construction adhesive & screw drywall to framing as recomm. by <br /> supplier. Provide backlocking on non-depressed edges to avoid raised <br /> taped edges. <br /> 24. Provide metal L-trim where gypsum board is flush w/ hardwood or other <br /> dissimilar material. Keep joint clean of material. <br /> 25. Treated post, w/ galvanized post to concrete connector base fastened to <br /> 1/2" round threaded anchor bolt, 1" air space below post. <br /> 26. R-40 insulation at roof (12" ± ), fiberglass batts for trussed roofs, or equal. <br /> Provide air tight connections at all penetrations thru ceiling. <br /> #26A - Provide insulation baffles w/ 1" air space cont. as required. <br /> 27. Roofing system to be cedar shakes, heavy grade, hand-split & re-sawn <br /> cedar shakes, #1, blue label; verify match w/ existing. Install according to <br /> UBC w/ 30 lb. felt underlayment & 30 lb. felt inter-coursing. See Keynote <br /> #16 for W.R. Grace, Ice & Water Shield Barrier below shingles at roof <br /> edges & all roof valley & wall junctures, etc. <br /> 28. Cut new opening in existing block foundation wall for new 3'-0" x 6-8" <br /> door & frame. Provide new concrete block lintel w/ 2 - #5's cont., bearing <br /> 4" on each side or 2 - 6"x 6"x 1/4" steel angles cut & let into masonry joints <br /> at each side; patch floor as required. #28A - Clean existing below grade <br /> foundation walls to remain in new basement. <br /> 29. Steel pipe colums to have top and bottom connector plates as required, see <br /> drawings for special bearing plate conditions; 1/2" thick bottom plates <br /> typical. <br /> 30. Sound partitions at bathroom 104 walls separating room 107. One layer <br /> 5/8" gypsum board panel over RC-1 channel, spaced 24" o.c. bathroom <br /> side; 3" Thermafiber SAFB insulation between wood studs; wood <br /> paneling or 5/8" gypsum board behind book shelves opposite side. End <br /> joints blocked w/ RC-1 channel, joints finished, perimeter caulked; STC <br /> 50, UL Des U311. #30A - Exterior partition east wall, room 101, to be <br /> sound partition; 2 - 2x4 stud walls, spaced for 2" Thermafiber SAFB <br /> insulation between; 3 1/2" R-15 high density batt insulation at each stud; <br /> inside RC-1 channel at 24" o.c., 1/2" gypsum board panels, perimeter <br /> caulked. <br /> 31. Tie existing attic vent space w/ new attic area, cut holes in existing <br /> sheathing board. Provide vent holes from new vaulted air space to new <br /> attic area. <br /> 32. Remove existing beam, portion of wall, etc. as required for new work; <br /> brace structure; install ne�v beam as noted w/ continuous support below <br /> new posts. <br /> 33. Remove portion of wall, ceiling or floor; windows, doors; electrical, <br /> 9 <br />