My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00635 - addn/remode/repair
Orono
>
Property Files
>
Street Address
>
E
>
Edgewood Hills Road
>
965 Edgewood Hills Road - 02-117-23-14-0001
>
Permits/Inspections
>
2009-00635 - addn/remode/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:06:39 PM
Creation date
7/14/2016 11:24:20 AM
Metadata
Fields
Template:
x Address Old
House Number
965
Street Name
Edgewood Hills
Street Type
Road
Address
965 Edgewood Hills Rd
Document Type
Permits/Inspections
PIN
0211723140001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ,. <br /> F'• <br /> �i;t' <br /> ��/ ��t_'��I��' � �fr'�,����,: <br /> ���,� � <br /> Basset Creek Business Center <br /> 901 North 3rd Street,#100 <br /> Minneapolis, MN 55401 <br /> structural 6I2-827-7825 voice <br /> engineers 612-827-0805 fax <br /> Date: September 22,2009 <br /> To: James L. Patsch Construction, Inc. <br /> 3427 Humboldt Ave. S. <br /> Minneapolis, MN 55408 <br /> Attn: Jim Patsch <br /> From: Eric Bunkers <br /> Project: Cusick Residence <br /> 965 Edgewood Hills Rd. <br /> Orono, MN <br /> Proj. No: 09268 <br /> Subject: Proposed Addition <br /> Dear Jim: <br /> As requested,we designed new foundations and a main floor beam for the above referenced project. We <br /> have designed the new members using a roof and floor dead load of 15 psf,a roof snow load 35 psf, and a <br /> 40 psf floor live load in accordance with the Minnesota State Building Code. Our work only includes <br /> designing the new foundation and beam as shown at the above reference project and is based on drawings <br /> provided by you. <br /> Attached are 2 framing sheets with annotated framing notes and 2 detail sheets showing the new members <br /> and connections. All framing shall be shored and temporarily braced as required by the contractor and all <br /> minimum nailing shall be in accordance with IRC Table R602.3(1). Lumber shall be minimum#2 SPF with <br /> treated lumber to be#2 S. Pine and engineered lumber to have Fb=2600 psi with E= 1.9. Our calculations <br /> assume all lumber is of good quality and does not have large splits and checks and shall be visually <br /> inspected by the contractor at the time of construction. All fasteners in contact with treated lumber shall be <br /> G185 hot dipped galvanized or equal. Steel wide flanges shall meet ASTM A992 and miscellaneous steel <br /> shall meet ASTM A36. <br /> Concrete used for footings (4"slump) and masonry core grout(8"slump}shall have a 28 day compressive <br /> strength of 3000 psi. The new foundations have been designed as directed by you as a result of your <br /> conversations with Stork Twin City Testing Corp. based on their preliminary soil boring findings. The existing <br /> footings have been assumed to be typical spread footings on good soils that are assumed to be performing <br /> adequately. The contractor shall also verify the condition of structural members and foundations affected by <br /> the remodeling with the engineer as indicated on the attached plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.