Laserfiche WebLink
Part B. DEPRESSURIZATION PROTECTION <br /> Check option used: � Fuel burning equipment (complete schedules below) ❑ No fuel burning equipment . <br /> INSTRUCT[ONS EXHAUST/MAKE-UP AIR SCHEDULE* <br /> Step l. Complete the Cor�ibcrstio�z Eqtripnient Schedc�le below. Only equipment Exhaust devices over 300 cfin Flow <br /> with a Y(Yes)may be selected under the"Category 1"alternate. r��.���� r cfrn <br /> Step 2. Complete E.nc�a�st/M«ke-tlp Air Schedule on the right if d'u•ect or power cfrn <br /> vented or solid fuel atmospheric vent space heating equipment is selected. cfin <br /> COMBUSTION EQUIPMENT SCHEDULE <br /> (check all types proposed) <br /> Space heating—nonsolid fuel Sealed combustion Y Hearth — nonsolid fuel ❑ Sealed combustion Y <br /> 'Direct oi• ower vented Y* �1 Direct or ower vented Y <br /> Atmos herically vented N Atmos hericall vented N <br /> Water heating—nonsolid fuel ❑ Sealed coinbustion Y Space heating—solid fuel ❑ Atmos hericall vented Y* <br /> C9 Direct or ower vented Y Water heating—solid fuel ❑ Atmosphericall vented Y <br /> Atmospherically vented N Hearth—solid fuel ❑ Atmos hericall vented Y <br /> * If atmospherically vented solid fuel or direct or power vented nonsolid fuel space heating is installed,then make-up air to match flow is require <br /> for each individual exhaust device�vhich exceeds 300 cubic feet per minute. <br /> Part C 1. VENTILATION <br /> VENTII,ATION QUANTITY <br /> (Mechanical ventilation must be provided per the larger quantity calculated below) <br /> 7 � �?�---'. cubic feet x 0.00583/minute = ( � ' cfm ( � x 15 cfm/bedroom)+15 cfm= `'l j� cfm <br /> . _ __. _ <br /> volume of habitable rooms number of bedrooms <br /> VENTILATION FAN SCHEDULE <br /> ____� _ . . .__ _ _.. . _.__.... _ _._ �.._. <br /> Check method(s)proposed -� ❑ Exhaust only E�. Balanced (heat recovery ventilator, air exchanger,etc.) <br /> _ _ _ <br /> Fan descri tion or location � TOTALS <br /> VENTILATION Intake cfm cfm cfm cfm cfrn <br /> AS DESIGNED Exhaust cfin cfm cfin cfin cfm <br /> Statement of Compliance: The proposed building design represented in these documents is consistent with the building plans,specifications, <br /> and other calculations submitted with the permit application. The proposed building has been designed to meet the requirements of the <br /> Minnesota Energy Code. <br /> �t�J�'.C�� L, N�L C l /�- \ 1���CtL:i.��� ��'' �ct�'L E� t�� otc�" �'i�+ � � (`rt'U <br /> Applicant(print name) Signature Date Telephone number <br /> Part C2. VENTILATION (Submit Part Cz upon completion of system veri�cationj-) <br /> �- --------- <br /> Job Site Address: Permit Number <br /> Fan descri tion or location TOTALS <br /> MEASURED Intake cfm cfm cfin cfin cfm <br /> PERFORMANCE� Exhaust cfin cfin cfin cfin cfrn <br /> j' Ventilation rate must be measured and verified when the perfomiance option is used in lieu of the prescriptive option for the sealing of <br /> joints in the building conditioned envelope(from Part A). <br /> Compliance Statement: Installed ventilation system is in compliance with MN Energy Code and is sized to provide the design air flow. <br /> Applicant(print name) Signature Date Telephone number <br /> i� <br />