Laserfiche WebLink
' � , � <br /> Christine Mattson <br /> From: Roger Peitso <br /> Sent: Monday, June 06, 2016 2:00 PM <br /> To: Jesse Hartung <br /> Cc: Jeremy Barnhart; Christine Mattson <br /> Subject: RE: Bayside Rd Final Septic design <br /> Have the septic sites the Steve has found fenced off with silt fence or snow fence and verification that he found 2 sites <br /> will be good. We can verify the fencing at the same time we do our pre-walk through inspection you will need to <br /> schedule as part of the demo permit. <br /> Roger <br /> From:Jesse Hartung [mailto:jesse@modernconstructiomm�.com] <br /> Sent: Monday,June 06, 2016 1:49 PM <br /> To: Roger Peitso <rpeitso@ci.orono.mn.us> <br /> Subject: RE: Bayside Rd Final Septic design <br /> Sounds good, would it suffice to have Steve call and confirm he has 2 viable sites to release the demo permit? <br /> J��s� s a n <br /> President <br /> Direct: 952.217.1627 <br /> Email: jesse@modernconstructiomm�.com <br /> �CCI fl���'i��#101'� �� Oi'�������� �riG. <br /> Office: 763.200.6376 � Fax: 866.259.8354 <br /> 621 Main ST <br /> Elk River, MN 55330 <br /> www.modernconstructiomm�.com <br /> From: Roger Peitso [mailto:rpeitso@ci.orono.mn.us] <br /> Sent: Monday,June 6, 2016 1:43 PM <br /> To:Jesse Hartung<jesse@modernconstructiomm�.com> <br /> Subject: RE: Bayside Rd Final Septic design <br /> Jesse, <br /> The demo permit is separate but I need a septic design in hand before I can issue a demo permit.The first design was <br /> accepted on the premise that it was not to close to the property lines and it was to close. I need to know that we have 2 <br /> viable sites.Any questions please call. <br /> Sincerely, <br /> Roger <br /> 1 <br />