My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00293 - roofing - cedar
Orono
>
Property Files
>
Street Address
>
D
>
Dunwoody Avenue
>
2525 Dunwoody Avenue - 20-117-23-22-0018
>
Permits/Inspections
>
2010-00293 - roofing - cedar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:53:04 PM
Creation date
7/11/2016 11:23:06 AM
Metadata
Fields
Template:
x Address Old
House Number
2525
Street Name
Dunwoody
Street Type
Avenue
Address
2525 Dunwoody Avenue
Document Type
Permits/Inspections
PIN
2011723220018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: 04/30/2010 10 :33 #562 P.003/005 <br /> � <br /> FOREMAN COPY <br /> Cathy Peel <br /> 25Z5 Dunwoody Ave <br /> Wayzata, MN 55391 <br /> We have inspected the existing roofing on your home and garage. The existing roofing <br /> consists of deteriorated cedar shingles. Les Jones Roofing wiA be bidding on the tear off <br /> and reroofing of your home and garage. We propose to do the following work. <br /> Not included in our scope of work: <br /> • Flat Roof <br /> • Metal Pans <br /> �EDAR SHINGLE SPECIFICATIONS <br /> Tea r Off <br /> 1. We will tear off the existing roofing on your home and garage. All debris will be <br /> cleaned up and hauled away. <br /> During the tear off process, debris may sift down through the roof boards. <br /> Therefore, we highly recommend that you remove or cover any items that may <br /> be stored in the attic area. We cannot be held liable (referring to the debris <br /> sifiting through) for any interior contents during this process. <br /> Underlayments <br /> 1. New afuminum gutter apron may be installed; to be determined on site. <br /> 2. Snow and fce barrier will be installed up the first six feet at the eaves. <br /> 3. Snow and ice barrier will be installed three feet wide in valleys. <br /> 4. One layer of Shingle Mate wifl be installed over the remaining exposed roof area. <br /> 5. Prefinished metal 24"W-style valley will be installed. <br /> Vents <br /> 1. A new prefinished plumbing vent will be installed to replace the existing. <br /> 2. We will remove and install a new he t base, cap coflar and flange to replace the <br /> existing. Note: The actual heat stac� itself will not be removed or replaced. <br /> 3. Eleven new galvanized, prefinished bird proof roof vents will be installed. The <br /> cofor will match the new shingles as close as possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.