My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P03029 - demo
Orono
>
Property Files
>
Street Address
>
D
>
Dunwoody Avenue
>
2480 Dunwoody Avenue - 20-117-23-21-0003
>
Permits/Inspections
>
2000-P03029 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:51:30 PM
Creation date
7/11/2016 10:23:47 AM
Metadata
Fields
Template:
x Address Old
House Number
2480
Street Name
Dunwoody
Street Type
Avenue
Address
2480 Dunwoody Avenue
Document Type
Permits/Inspections
PIN
2011723210003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�r. <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. well abandonmment, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call (612) 249-4600. <br /> JOB SITE ADDRESS: ����5� '��+�R l�``��� �1 l��C� <br /> Occupancy Type: ✓Residential Commercial <br /> OWNER'S NAM�::-�'`1 1� � �=` Phone: �--t`�� ^�.1 ' <br /> Mailing Address: _ � City: <br /> CONTRACTOR'S NAME: � -�-� �C1`-1�`. �. Bus.No.: �t1�—��-� <br /> Mailing Address: City: <br /> Demolition if planned by means of: manual disassembly �=�,� � �-��� � <br /> �heavy equipment <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit, the undersigned owner hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.