Laserfiche WebLink
' MEMORANDUM <br /> To: Chair Ralm and Planning Corrunission <br /> Greg Gappa, Public Services Director <br /> From: Mike Gaffron, Plaiuiing Director <br /> Date: July 18, 2005 <br /> Subject: Navarre Parking Lot Study—Potential Issues to be Addressed <br /> Following is a list of issues that should be addressed in the parking study that will be <br /> required of the applicants for the Narrows Saloon expansion. The list is intended to <br /> provide a set of minimum expectations for the results to be gained from that st�idy. <br /> 1. Analysis of parking needs of all conunercial businesses that abut the public <br /> parking lot: <br /> - parking needs based square footages of all existing uses, including <br /> occupied and potentially occupiable interior spaces <br /> - potential parking needs based on potential uses—relate to permitted and <br /> conditional uses allowed in B-1 District <br /> - review of"prior commitments"made by the City to various business <br /> owners <br /> 2. Analysis of parking needs for non-comnlercial uses of the parking lot inchiding: <br /> - Park& Ride <br /> - Navarre Paxk <br /> - Other unidentified uses not directly serving sui�ounding businesses <br /> 3. Relationship of peak parking need times/holirs for various businesses and other <br /> uses served by the lot. <br /> 4. Analysis of parking provided and/or potentially developable within the various <br /> private business properties abutting the public parking lot. <br /> 5. Estimate of parking stalls available in public lot under current configuration, and <br /> estirnate of inaximum number of parking stalls that might be potentially available <br /> under various reconfigurations baseci on: <br /> a) existing 9'x16' stalls with 20-22' drive aisles; arld <br /> b) a revised conf'iguration based on City standard of 9'x 20' stalls per <br /> zoning code 78-1491(g) and conforming with all setback and other <br /> standards contained in 78-1491 thru 78-1515. <br />