My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-2005 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2005
>
09-19-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2012 3:49:25 PM
Creation date
4/4/2012 3:49:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Sep 19 2005 8: 42 BONESTR00 ROSENE ANDERLIK 6516361311 p. l <br /> 2335 West Highway 3G - St. Paul, MN 55113 <br /> ' Bonestroo <br /> 0 Rosene Office: G51-�3G-4600 • Fax:651-G36-1311 <br /> � Anderlik& www.bonestroo.com <br /> Associates <br /> Engineers&Architects <br /> September 16,2005 <br /> Ms. Janice Gundlach <br /> Planner <br /> City of Orono <br /> Post Of�ice Box 66 <br /> Crystal Bay,MN 55323 <br /> Re: Trinity Lutheran Church <br /> File No. 000139-05000-0 <br /> Plat No. OS-3149 <br /> Deaz Janice: <br /> We have reviewed the site plans dated 9-6-05 for the proposed improvements at the T 'ty Lutheran Church.The site is <br /> located in the northwest quadrant of the intersection of Brown Road North and HCSAH No. 6. The proposed <br /> improvements include parking lot improvements, a building addirion, and stortn se er improvements. We have the <br /> following comments wiYh regards to engineering matters: <br /> • The parking stalls shown are shorter than what the city generally requires. typical minimum stall length is <br /> 19-feet with a min;T„�drive aisle width of 25-feet.We recommend the strip g plan be revised to reflect these <br /> minimums. <br /> • The site was provided with a pressure sewer service siub a few years ago.To ate the church has not connected <br /> to this system.It appears the intent is to connect to this system as part of this improvement project.The plans <br /> should show the stub location and verify that it is their intent to connect to is system.The applicant should <br /> coordinate this connection with the city public works department and revie with the city any connections <br /> charges due. <br /> • Please see the attached comments from Lance Hoffregarding storm sewer i rovements and drainage issues. <br /> • We have estimated the costs for site improvements to be$228,586.00. The pplicant should provide the city <br /> with a letter of credit for 150%of this amount or$342,879_00 prior to any ork on site. <br /> If you have any questions please call me at(651)604-4863. <br /> Yours very truly, <br /> BONESTROO,ROSENE,ANDERLIK&ASSOCIATES,INC. <br /> ._._-- " <br /> �P�7 � <br /> Tom Kellogg <br /> Attachments <br /> Cc: Greg Gappa,City of Orono <br /> I <br /> St. Paul, St. Cloud, Rochester, MN ■ Miiwaukee, WI •'Chicago, IL <br /> Affirmative AcCion/Equal Opportunity Employer and EmployGe Owned <br /> f ' , • ;;�, :a , ,�� ( � <br />
The URL can be used to link to this page
Your browser does not support the video tag.