My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-2005 Planning Commission Packet
Orono
>
Planning Commission
>
2005
>
05-16-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2012 10:57:25 AM
Creation date
4/4/2012 10:57:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> Southwest property line. We have received an estimate from Norling tree of about $575 <br /> per tree including installation. <br /> In regards to the earlier point regarding storm water run-off we request the following: <br /> 1) Tl�e developer install native pllnts with deep root structures capable of slowing <br /> fihe rate of water flow and reducing the risk of fi�rther l�nd erosion within the <br /> sw�les. <br /> 2) To the extent tall bushes might be installed as 1 buffer, that they be located on the <br /> southwest side of the sw11e to-assure responsible property management of the --- <br /> swale by current and fiiture owners of the property. <br /> 3) City engineers look closely at the run-off issue within the 75-fooi seiback zone <br /> and create an appropriate grading of the property that assures the wlter does not <br /> encroach on our lot during heavy rainfall. <br /> We are respecfiful of Mr. Palm's right to develop his property within the City ordinances. <br /> We hope the City I'lanning Conlmittee thouglitfiilly addresses the signific�nt water <br /> management and erosion issues Mr. Palm faces with the density of his development on a <br /> narrow, steep lot. We understand this development will occur over a period of at least <br /> one year. We request that specific plans for erosion control and water re-direction be <br /> incorporated during the entire construction period. <br /> Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.