My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2002 Council Minutes
Orono
>
City Council
>
2002
>
10-14-2002 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2012 3:37:19 PM
Creation date
3/30/2012 3:37:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO CITY COUNCIL MEETING <br />MONDAY, OCTOBER 14, 2002 <br />13. Crystal Bay Road Drainage Project — Continued <br />stormwater treatment to improve the quality of the stormwater effluent discharge into <br />Crystal Bay. A plan was prepared for the low -cost option of installing a pipe across the <br />back yard of the 3447 Crystal Bay Road property and a drainage swale on the west edge <br />of the property located at 3435 Crystal Bay Road. The new swale would connect to an <br />existing swale, which would then drain into an in place culvert under Crystal Bay Road. <br />They requested quotations for the work from several landscaping companies. That option <br />would reduce the erosion and flooding problems on the properties in question and the <br />property owners were in support of the project. That option, however, does not improve <br />water quality, but could be seen as an interim project. Another option was to construct a <br />stormwater pond for water quality improvements, which would require the acquisition of a <br />property. <br />The most logical location for stormwater ponding is on the western side of the area, in the <br />vicinity of 3435, 3445, and 3447 Crystal Bay Road. Lot 3445 is currently vacant and <br />could be purchased to install a pond. Stormwater ponding anywhere close to Lake <br />Minnetonka would be expensive and difficult. If there were interest in purchasing the <br />property, the City would have to have an appraiser complete a valuation study for the <br />property at 3445 Crystal Bay Road. <br />• <br />Murphy asked if the lot was big enough to hold a pond. Gappa stated it was not what they • <br />chose, but it is available. Murphy asked if the pond would be big enough to fix the <br />problems for the entire neighborhood. <br />White asked what the culvert change was that caused the problem in 1996. A neighbor <br />stated that prior to 1996 it was dry. Work on the railroad track caused water to begin <br />flowing down the hill. The City then dug out a trench to direct water to the culvert, but <br />that resulted in water coming from both the culvert and down the hill. <br />White suggested putting a fiber filter into a pipe to improve water quality that would be <br />changed every year. Gappa stated that the area of concern was much too large to be <br />affected by a filter. <br />Mayor Peterson asked if the pipe and swale solution was a temporary fix. Gappa stated <br />that the low -cost pipe and swale plan would get water past the houses, solving that issue, <br />but not improve water quality. <br />White asked if the pipe would affect landowners' ability to build on their lots. Gappa <br />stated they would have to work around the pipe, but it should not be a major issue. <br />Mayor Peterson moved, and Murphy seconded, to accept the quotation from <br />Norling's Lake Minnetonka Landscaping in the amount of $13,418.12 for completion <br />0 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.