My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00237 - mechanical
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2750 Casco Point Road - 20-117-23-24-0020
>
Permits/Inspections
>
2016-00237 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:54:37 PM
Creation date
7/5/2016 3:18:06 PM
Metadata
Fields
Template:
x Address Old
House Number
2750
Street Name
Casco Point
Street Type
Road
Address
2750 Casco Point Road
Document Type
Permits/Inspections
PIN
2011723240020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section B <br /> Ventilation Method <br /> (Choose either balanced or exhaust) <br /> ✓�alanced,HRV(Heat Recovery Ventilator)or ERV(Energy �xhaust only(Continuous fan rating in cfm) <br /> Recov-ery Ventilator)—cfm of unit in low must not exceed <br /> continuous venti-lation rating by more than 100%. <br /> Low cfm: 66 High cfm: ,)50 Continuous fan rating in cfm(capacity must not exceed <br /> continuous ventilation rating by more than 100%) <br /> Directions -Choose the method of ventilation, balanced or exhaust only. Balanced ventilation systems are typically HRV or <br /> ERV's. Enter the low and high cfm amounts. Low cfm air flow must be equal to or greater than the required continuous <br /> ventilation rate and/ess than 100%greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the ventilation <br /> fan must not exceed 80 cfm.)Automatic controls may allow the use of a larger fan that is operated a percentage of each <br /> hour. <br /> Section C <br /> Ventilation Fan <br /> Description Location Continuous Intermittent <br /> VENMAR 1.5 Mech.Room <br /> Directions - The ventilation fan schedule should describe what the fan is for, the location, cfm, and whether it is used for <br /> continuous or intermittent ventilation. The fan that is chose for continuous ventilation must be equal to or greater than the <br /> low cfm air rating and Iess than 100%greater than the continuous rate. (For instance, if the low cfm is 40 cfm, the <br /> continuous ventilation fan must not exceed 80 cfm.) Automatic controls may allow the use of a larger fan that is operated a <br /> percentage of each hour. <br /> Section D <br /> Ventilation Controls <br /> Directions -Describe operation and control of fhe continuous and intermiftent ventilation. There should be adequate defail for plan <br /> reviewers and inspectors to verify design and installation comp/iance. Related trades also need adequate detail forplacement of controls <br /> and proper operation of the building ventilation. If exhaust fans are used for building ventilation, describe the operation and location of any <br /> controls, indicators and legends. If an ERV or HRV is to be installed, describe how if will be installed. If it will be connected and interfaced <br /> with the air handling equipment,please describe such connections as detailed in the manufactures'installation instructions. If the <br /> installation instructions require or recommend the equipment to be interlocked with the air handling equipment for proper operation, such <br /> interconnection shall 6e made and described. <br /> Venmar <br /> Honeywell <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.