My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2554
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 2500 - 2599 September 12, 1988 - March 13, 1989)
>
Resolution 2554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2016 2:47:28 PM
Creation date
7/5/2016 2:47:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. <br />7. The applicant <br />property based on <br />representatives of <br />City of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 2554 <br />has proposed a PRD plan for development of the <br />one or more of the findings noted by professional <br />the applicant: <br />A) The topographical and physical characteristics of the <br />property suggest a need for special design considerations - <br />variations in topography range from 1,044 feet at its highest <br />point to 994 feet at its lowest, resulting in over 50 feet of <br />grade separation. <br />B) The existence and location of mature maple and other <br />deciduous trees (densely populated forest of maple trees to the <br />west portion of the property and to the east young to mature <br />nursery stock of evergreen trees and other deciduous trees). <br />C) Need of providing an open space buffer to rural residential <br />• lot lines of surrounding properties, especially to the north and <br />west. <br />8. The City Engineer, Glenn Cook, has submitted a report dated <br />December 7, 1988 noting the following issues: <br />A) The access road for the plat shall be located approximately <br />800 feet from the north boundary line of the property. The <br />private road access will have a minimum sighting distance of 420 <br />feet to the north meeting a 45 mile per hour sighting standard. <br />North Brown Road is posted at a 30 mile per hour speed. <br />B) The temporary construction road is not feasible based on the <br />steep topographies that run along the east/west boundaries of <br />Highway 12. In addition a road cut would require the major <br />removal of existing trees. <br />C) Upon a site inspection of the existing contours within the <br />commercial corridor, the east/west road appears most feasible and <br />will provide applicant with adequate area for future development <br />within the commercial corridor. The proposed outlot for future <br />road extension shall remain as proposed on the preliminary plans. <br />The Engineer has provided an example of one option for the layout <br />of the access road. <br />9. Neighborhood residents are justly concerned about increased <br />• traffic in and through their neighborhood. The intent of the Council <br />is to accommodate any new traffic flow in the safest manner possible <br />with the least adverse affect on the immediate neighorhood and on the <br />public generally. <br />Page 5 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.