My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-25-2002 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
2000-2009
>
2002
>
03-25-2002 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2012 3:14:13 PM
Creation date
3/30/2012 3:14:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, March 25, 2002 <br />• 7:00 o'clock p.m. <br />APPROVAL OF MINUTES <br />*( #3) Regular Council Meeting of March 11, 2002 <br />Flint moved, White seconded, to approve the minutes of the Regular Council <br />meeting of March 11, 2002. VOTE: Ayes 5, Nays 0. <br />PARK COMMISSION COMMENTS — Andrew McDermott, Representative <br />McDermott stated the Park Commission will be proceeding forward with the items the Council <br />recommended at the work session held earlier this evening. <br />PLANNING COMMISSION COMMENTS — Dan Kluth, Representative <br />Kluth indicated the Planning Commission has had a work session recently, with another one scheduled <br />for this Thursday. Kluth stated the Planning Commission is considering holding regularly scheduled <br />work sessions to help address the number of issues that need to be considered in the upcoming year. <br />• PUBLIC COMMENTS <br />None <br />ZONING ADMINISTRATOR'S REPORT <br />( #4) #02 -2745 ILONA AND KENNETH PETERSON, 1074 WILDHURST TRAIL — <br />VARIANCES, RESOLUTION NO. 4774 <br />Ken Peterson, Applicant, and Jack Carter, Contractor, were present. <br />Weinberger stated the Applicant is requesting variances to permit land alteration and construction of a <br />garage /enclosed walkway that encroaches 24' into a required 26' wetland buffer. Weinberger stated the <br />lot is currently vacant and lies within the LR -1B, Single Family Lakeshore Residential District. The <br />City's Flood Plain and Wetlands Management Ordinance does not permit filling, grading, excavation, <br />hardcover and structures within a protected wetland and within 26' of the edge of the wetland. A <br />variance is also required to permit the garage to be located 17.76' from the front property line, where a <br />35' setback is required. Weinberger indicated the proposed garage is a two -level building with <br />driveway access to each level. <br />Weinberger noted this property was originally created in 1991, as part of the Wildhurst Estates <br />development, and at the time it was created was a conforming lot. Weinberger stated since 1991, <br />however, the way in which wetlands are delineated has changed, which has resulted in the location of <br />• the edge of the wetland and the area of the lot being changed. The size of the lot, including the <br />wetlands, is slightly over two acres. <br />PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.