My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-003943 - replace 3 tanks
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
720 Dickey Lake Drive - 34-118-23-22-0003
>
Permits/Inspections
>
1991-003943 - replace 3 tanks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:01 PM
Creation date
7/5/2016 2:36:13 PM
Metadata
Fields
Template:
x Address Old
House Number
720
Street Name
Dickey Lake
Street Type
Drive
Address
720 Dickey Lake Drive
Document Type
Permits/Inspections
PIN
3411823220003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�SPPLICATION FOR SEPTIC SYSTEM PERMIT <br /> CITY OF ORONO <br /> Box 66 (1335 So Brown Rd) <br /> Czystal Bay, MN 55323 <br /> *******��**************�******�****:****************:*****�***�****�*****�* <br /> General Instructions: <br /> 1. You may apply for septic system permits by mail or in perscn at the <br /> City offices. However, permits will not be mailed out and must be <br /> picked up in person at the City offices. <br /> 2. Permits are not valid until you receive a permit card. <br /> 3. Work must not begin unless the permit card is available on the job <br /> site. <br /> 4 . Permits will be issued only to contractors holding a City of Orono <br /> Septic System Installer' s License. <br /> 5 . All work must be done in accordance with the approved septic system <br /> design. Design reports are not considered approved unless accompanied <br /> by the "City of Orono Septic System Approval" cover sheet signed by <br /> the City Inspector. <br /> 6 . The following inspections will be required for all septic systems: <br /> a) Pre-installation site inspection to include inspector, installer, <br /> and genera 1 contractor. <br /> b) Tank installation prior to covering. <br /> c) Drainfield trench installation prior to covering. For mounds, <br /> inspection is required after rough-up but prior to sand placement <br /> (sand will be jar tested for silt content) , and again during <br /> pressure distribution piping installation in the rock bed. <br /> d) Final inspection to verify proper final cover depths and to <br /> verify that all pump station (where required) components are <br /> functional and comply with codes. <br /> 7. Individual holding MPCA Installer Certificate shall be present during <br /> installation. 24-hour notice is required for all inspections. <br /> *:********�********�*��**�**�**�***s�**�*:***�**:********�**:**�##�r****:�** <br /> . � <br /> JOB SITE ADDRESS: ,�� <br /> Occupancy Type: Residential� Commercial Other <br /> � <br /> Owner' s Name: ��%d � ,��z.J�7y-,.��� Phone: L/7�� '� j � <br /> Mailing Address: , City: ��i�_,�;,,�.� _ Zip: <br /> � <br /> Septic Contractor' s Name: ,!_ � Bus. Phone: �% �� S � <br /> , <br /> Mailing Address: �% �;� J,:��„Z,- City: Zip: 5.5�� �� <br /> ****�********��*�:�r��**�**��***** ******:*******�***�********#**�********:* <br /> - over - <br />
The URL can be used to link to this page
Your browser does not support the video tag.