My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RE: screening/accessory structures. etc
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
710 Dickey Lake Drive - 34-118-23-22-0016
>
Correspondence
>
RE: screening/accessory structures. etc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:23 PM
Creation date
7/5/2016 2:18:19 PM
Metadata
Fields
Template:
x Address Old
House Number
710
Street Name
Dickey Lake
Street Type
Drive
Address
710 Dickey Lake Drive
Document Type
Correspondence
PIN
3411823220016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 3. <br /> ACCESSORY BUILDINGS <br /> Sec. 78-1431. Accessory buildings and structures on through lots. <br /> All accessory buildings and structures on through lots located in R districts shall meet the following <br /> requirements: <br /> (1) The building or structure shall meet the principal building setbacks that are established under <br /> sections 78-230, 78-255, 78-305, 78-330, 78-350, 78-370, 78-395, 78-420, 78-444. <br /> (2) No negative impacts to adjacent neighbors or public right-of-way result in the placement of the <br /> building or structure, determined at the discretion of the planning director. <br /> Should the planning director determine that item (2) above cannot be met an accessory structure or <br /> building may be permitted by conditional use permit if the planning commission determines no negative <br /> impacts result in the placement of the building ar structure. The planning commission may apply <br /> reasonable conditions as part of the approval. <br /> (Code 1984, § 10.03(10); Ord. No. 15 3rd series, § 1, 6-28-2004) <br /> Sec. 78-1432. Time of construction. <br /> No accessory building or structure shall be constructed on any lot prior to the time of construction of the <br /> principal building to which it is accessory. At the time of demolition of the principal building, all <br /> nonconforming accessory structures must be removed. Accessory structures, which comply with this title, are <br /> allowed to remain contingent on a signed agreement stating the following: <br /> (1) Applicants agree to obtain a building permit for construction of the replacement residence within <br /> 60 days of demolition; to begin construction on the new residence within 120 days of demolition; <br /> and to complete all exterior work within one year of building permit issuance and interior work <br /> within two years of building permit issuance. <br /> (2) In the event that any activity described in item (1) has not been accomplished within the defined <br /> timeframe, the applicants shall remove the accessory structures at the applicants' expense, or the <br /> applicants shall apply for an extension of this agreement. <br /> (3) If one of the item (1) events occurs and the applicants fail to perform their removal obligations <br /> per item (2), the applicants hereby agree as follows: <br /> a. The city may enter upon the property and remove the accessory building(s). <br /> b. The city may assess the costs of removal to the property. <br /> (4) The agreement shall be binding upon current and future owners of the property, and shall be filed <br /> within the chain of title of the property. <br />
The URL can be used to link to this page
Your browser does not support the video tag.