Laserfiche WebLink
ORONO CITY COUNCIL MEETING <br />MONDAY, FEBRUARY 25, 2002 <br />• 7. #02 -2746 Mark Finney, 3210 North Shore Drive — Variances — Continued <br />shifted to be flush with the existing house line. They also recommended a proposed <br />garage be reduced in size. Mr. Finney agreed to that and reduced the size in order to only <br />require a 10' setback. The final survey work on the revised plans was not yet in. In order <br />to shift the addition and preserve yard space on the other side of the house, they made the <br />addition longer and narrower, so that overall, it is the same size as the addition the <br />Planning Commission reviewed. <br />In addition to that, there is a proposed ground level deck and enclosed screen porch to be <br />constructed on the front side of the house. They wish to increase the screen porch so that <br />it can be accessed directly from the house. <br />Hardcover would be reduced substantially, but would still be over the 25% allowed <br />hardcover. Even with the addition shifted to match the current house line, there is a <br />variance required for the side setback because the addition would sit 8' from the side yard <br />setback. The final survey work is needed to locate a sewer line to make sure the proposed <br />garage not be located over the sewer line. If it is not, then a utility easement would be <br />required over the area of the sewer line. Most of the conditions made by the Planning <br />Commission have already been met by the applicant's revised plans. Weinberger stated <br />the staff would be comfortable recommending approval subject to the final survey work <br />and locating the sewer lines. <br />• Mr. Finney stated he would do whatever it takes to meet the City's requirements. <br />Sansevere and Nygard stated they supported staff's recommendation. <br />Moorse clarified that the screened porch would be fine as long as it stays under the 15% <br />structural coverage maximum. <br />Flint moved, and Mayor Peterson seconded, to approve the application subject to the <br />final survey being completed, the sewer being located, and subject to the final <br />resolution being drafted. <br />Vote: Ayes 4, Nays 0. <br />8. #02 -2747 Tonka Ventures, 3749 Livingston Avenue — Easement Vacation — <br />Resolution No. 4761 <br />John Gleason with Hillcrest Northwest Townhomes was present. He stated he was the <br />builder, not the developer, with the project. <br />Flint stated he removed it from the consent agenda because of the neighbor's concern over <br />tree removal and replacement, and erosion that was depositing material on adjacent lots. <br />• Mr. Gleason stated that they need to follow an approved building plan, and until the last <br />