My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUD #1 Agreement and amendment-1990&1998
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
710 Dickey Lake Drive - 34-118-23-22-0016
>
Land Use
>
PUD #1 Agreement and amendment-1990&1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:23 PM
Creation date
7/5/2016 2:07:06 PM
Metadata
Fields
Template:
x Address Old
House Number
710
Street Name
Dickey Lake
Street Type
Drive
Address
710 Dickey Lake Drive
Document Type
Land Use
PIN
3411823220016
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and used by the owner of Lot 1 as part of the landscape <br /> and garden business on Lot 1. <br /> For special assessment purposes relating to the � <br /> construction of a road improvement on Outlot C, the <br /> Developer agrees that benefit to Lot 1 from the road will <br /> not take into account the presence of the existing Willow <br /> Drive access; the City agrees that the construction of the <br /> road on outlot C will not require the Wiliow Drive access <br /> be closed. <br /> The present access from Highway 12 to Lots 1 and 2 is <br /> approved as part of the PUD for ingress only. In its sole <br /> discretion the Orono city council by a three member vote <br /> may approve the right of egress but only upon the request <br /> of the owner of Lot 1. <br /> If Lot 2 ceases to be owned and used by the owner of Lot <br /> 1 in conjunction with the use of Lot 1 or is developed <br /> independently, then Lot 2 shall be obligated to develop <br /> access via Outlot C unless the City in its sole discretion <br /> determines that alternative access is adequate. <br /> 5, BuildinQ DesiQn and Construction: The improvements on <br /> said Lot 1 shall be constructed according to the plans on <br /> file with the City of Orono. The building plans show a <br /> main building with a partial second floor and an <br /> accessory building, and production greenhouses, all on <br /> said Lot l. The exterior of the building shall be of a <br /> combination of tan and dark brown concrete blocks with <br /> split-face stone finish with trim of dark brown and green <br /> to match anodized aluminum with clear glazing used through <br /> area where plant materials are maintained. All accessory <br /> structures shall be of the same exterior finish and <br /> exterior colors as shown on elevation plans attached to <br /> this agreement. <br /> To the extent Developer builds structures on Lot 2 for use <br /> in conjunction with his business on Lot 1, such structures <br /> on Lot 2 shall be constructed of the same materials and of <br /> the same cruality as those on Lot 1. <br /> 6. Heic�ht: The portions of the flat roof are at a height of <br /> 30' or less. The two story portion of the building with <br /> the gabled roof is 32 ' 6" to the peak, 21'8" to the eave, <br /> and 27 ' to the mid-point. The height of this building to <br /> the peak not to exceed 32 '6^ is permitted pursuant to this <br /> PUD Agreement. �: . <br /> 7 . Si�;�s : The signs and signage in said Lot 1 shall conform <br /> to the Sign Plans (4 pages) dated April 5, 1990 on file <br /> with the City and are permitted pursuant to this PUD <br /> Agreement. In consideration of the fact that the said <br /> sign plans permit Developer's pylon sign to be closer to <br /> - Initials of Developer � � <br /> Initials of City Clerk <br /> Paqe 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.